Energy Centre Building, Pipework (western Arm) Pipework (eastern Arm) 1 Minerva Road Park Royal NW10 6HJ Data via plota.co.uk

263686OPDCOB - OPDC Consultation by Other Boroughs Pending Consideration

Proposal

Partial details of part (i) of condition 7 (Construction Logistics Plans) and part (i) of condition 8 (Construction and Environmental Management Plans), in relation to the demolition and piling mat works at 1 Minerva Road only; Partial details of parts (ii) and (iii) of condition 7 (Construction Logistics Plans) and parts (ii) and (iii) of condition 8 (Construction and Environmental Management Plans), in relation to the installation of the buried pipework along Minerva Road and North Acton Road only; and Partial details of condition 11 (HS2 Safeguarding), in relation to 1 Minerva Road and works along Minerva Road and North Acton Road only; pursuant to planning permission reference dated 25/03/2026, for 'Development associated with the Old Oak and Park Royal Energy Network (OPEN) district heating network, comprising: Demolition of a warehouse building at 1 Minerva Road, London, NW10 6HJ, and erection of a purposebuilt energy centre building; Laying of a network of underground heat pipes; Erection of a crossover gantry to carry the pipework over existing railway tracks, running parallel to the Park Royal Road Overbridge; and Other associated works.' (Out of Borough) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
Decision
Expected by 21 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 21 Oct 2026.

Site constraints 5

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £5,339,000 in April 2024. Other property, freehold.

12 April 2024£5,339,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
OPDC Consultation by Other Boroughs
Postcode
NW10 6HJ
Received
1 Oct 2026
Validated
1 Oct 2026
Ward
North Acton
Case officer
Show
Target decision
21 Oct 2026

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
21 Oct 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use