1 Minerva Road Park Royal NW10 6HJ Data via plota.co.uk

263581OPDCOB - OPDC Consultation by Other Boroughs Pending Consideration

Proposal

Energy centre building: 1 Minerva Road, London, NW10 6HJ; Pipework (westernarm): Route along parts of Minerva Road, Acton Lane, Coronation Road, Abbey Road, Central Way, Gorst Road, Park Royal Road overbridge and adjacent railway land, Victoria Road and Wales Farm Road: Pipework (eastern arm): Route along parts of - North Acton Road, Chase Road, Minerva Road, Bashley Road, St Leonard's Road and Chandos Road. (Out of Borough) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Sept 2026
Decision
Expected by 14 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Nov 2026 and 2 Dec 2026, from Ealing's recent utility and infrastructure works.

Site constraints 5

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £5,339,000 in April 2024. Other property, freehold.

12 April 2024£5,339,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
OPDC Consultation by Other Boroughs
Postcode
NW10 6HJ
Received
24 Sept 2026
Validated
24 Sept 2026
Ward
North Acton
Target decision
14 Oct 2026

Decision outlook

Day 15 of the 56-day target. Ealing usually decides utility and infrastructure works by day 61.

Day 1546 days to the predicted decision (day 61)
42%decided within 8 weeks
88%approved
68decided in the last year

Plota live figures for utility and infrastructure works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
14 Oct 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use