King George's Hall Northgate Blackburn BB2 1AA Data via plota.co.uk

Proposal

Installation of plant and associated gantry, installation of ducting to conceal new services, installation of flue, installation of metal external staircases and boarding over of 3rd floor windows to east and west elevations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Dec 2025
✓
Validated
23 Dec 2025
✓
Approved
21 Aug 2026

Approved on 21 Aug 2026 · Planning and Highways Committee · Last checked 19 Oct 2026

Documents 30

All documents on the council site ↗

Licence at this address

  • Licence King Georges Hall Premises licence · in force since 17 Aug 2005 Hours not given on the register

Licensed hours are what the licence permits, not opening times.

Site constraints 5

7 listed buildings within 150 m of the postcode pin
Nearest: Central Police Station and Court House, Grade II, about 17 m from the postcode pin · 7 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Northgate conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Radon affected area, class 3; Coalfield, development low risk area; Inside the Blackburn (Blackburn with Darwen) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Blackburn - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Blackburn
Application type
Listed Building Application
Postcode
BB2 1AA
Received
22 Dec 2025
Validated
23 Dec 2025
Ward
Blackburn Central
Parish
Blackburn
Case officer
Show
Target decision
24 Aug 2026
Decision
CONSENT
Decision date
21 Aug 2026
Decision level
Planning and Highways Committee
Applicant
Show
Agent
Cassidy + Ashton Group Ltd.

How this decision compares

Decided in 241 days from validation, 167 days slower than Blackburn's median of 74 for commercial and major works. Approved, as 98% of commercial and major works here are.

43%decided within 8 weeks
98%approved
25%go to committee

Plota live figures for commercial and major works decided by Blackburn in the last twelve months, from validation. Blackburn decision record →

Consultation & key dates

Committee
20 Aug 2026
Statutory expiry
24 Aug 2026
Blackburn
Planning Authority Score
7.2/10
Good
#55 of 296 councils
Relevant to this application:
Other decisions

Blackburn is faster than most councils at deciding householder applications, ranking #90 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Blackburn decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #7 of 296
98%
Householder approved
Above avg (90%) #10 of 296
73%
Decided in 8 weeks
Above avg (63%) #90 of 296
40%
Extended time limit
Below avg (41%) #147 of 296
88%
Minor dwellings approved
40 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
56 decided
519
Total decisions
23 refused in the year to March 2026