Sheffield Hallam University Mundella House 34 Collegiate Crescent Sheffield S10 2BJ Data via plota.co.uk

26/01685/TDD - Dead/Dangerous Tree Approved

Proposal

Removal of a tree (Broomhall Conservation Area) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Jun 2026
✓
Approved
11 Jun 2026

Approved on 11 Jun 2026 · Delegated decision · Last checked 5 Jul 2026

Site constraints 8

Broomhall conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Sheffield Citywide AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
10 listed buildings within 150 m of the postcode pin
Nearest: 1, Park Lane, Grade II, about 51 m from the postcode pin · 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; Local nature reserve about 411 m away: Sunnybank; Coalfield, development low risk area; Inside the Sheffield built-up area; Priority habitat about 33 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sheffield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sheffield
Application type
Dead/Dangerous Tree
Postcode
S10 2BJ
Received
5 Jun 2026
Validated
5 Jun 2026
Ward
Broomhill And Sharrow Vale
Case officer
Show
Target decision
17 Jul 2026
Decision
Grant
Decision date
11 Jun 2026
Decision level
Delegated decision
Applicant
Show
Agent
Sheffield Tree Care Ltd

How this decision compares

Decided in 6 days from validation, 21 days faster than Sheffield's median of 27 for tree and landscaping works. Approved, as 96% of tree and landscaping works here are.

98%decided within 8 weeks
96%approved
453decided in the last year

Plota live figures for tree and landscaping works decided by Sheffield in the last twelve months, from validation. Sheffield decision record →

Consultation & key dates

Statutory expiry
17 Jul 2026
Env. assessment
No
Sheffield
Planning Authority Score
4.4/10
Below average
#183 of 296 councils
Relevant to this application:
Householder decisions

Sheffield ranks #176 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sheffield decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #178 of 296
89%
Householder approved
Below avg (90%) #209 of 296
61%
Decided in 8 weeks
Below avg (63%) #176 of 296
36%
Extended time limit
Below avg (41%) #114 of 296
71%
Minor dwellings approved
144 decided (1-9 homes)
85%
Major dwellings approved
33 decided (10+ homes)
87%
Change of use approved
124 decided
1,756
Total decisions
237 refused in the year to March 2026