Land Off Junction Of A645 And A1041 Selby Road Camblesforth North Yorkshire Data via plota.co.uk

SELZG2025/1204/DOV - Modify/Discharge Legal Agreement Approved

Proposal

Request for a Deed of Variation to Section 106 agreement of approval Erection of 29 dwellings and associated infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Nov 2025
✓
Validated
28 Nov 2025
✓
Consultation
2 Dec 2025
✓
Approved
17 Feb 2026

Approved on 17 Feb 2026 · Delegated Decision · Last checked 8 Oct 2026

Associated applications 5

Site constraints 5

National infrastructure project about 400 m away: Helios Renewable Energy Project
The site is about 400 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Thorpe Marsh Gas Pipeline (decided, about 1.1 km); White Rose Carbon Capture and Storage Project (decided, about 1.3 km); Drax Bioenergy with Carbon Capture and Storage Project (decided, about 1.5 km); East Yorkshire Solar Farm (decided, about 1.7 km); Yorkshire and Humber CCS Cross Country Pipeline (decided, about 1.7 km); East Coast Hydrogen Humber Pipeline (at pre-application, about 778 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
2 listed buildings within 150 m of the postcode pin; Priority habitat about 7 m away: Deciduous woodland; Inside the Camblesforth built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Modify/Discharge Legal Agreement
Received
27 Nov 2025
Validated
28 Nov 2025
Ward
Camblesforth & Carlton
Parish
Camblesforth
Case officer
Show
Target decision
23 Jan 2026
Decision
Application Permitted
Decision date
17 Feb 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 81 days from validation, 13 days slower than Selby's median of 68 for section 106 and planning obligations. Approved, as 93% of section 106 and planning obligations here are.

43%decided within 8 weeks
93%approved
1,862decided in the last year

Plota live figures for section 106 and planning obligations decided across the UK in the last twelve months, from validation; too few recent section 106 and planning obligations in Selby to go on. Selby decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
2 Dec 2025
Comments by
23 Dec 2025
Statutory expiry
23 Jan 2026
Env. assessment
No