Site Of Former Mercure Hotel Tylers Way Watford Hertfordshire Data via plota.co.uk

25/1781/FUL - Full Planning Permission Deferred at committee

Deferred at planning committee on 5 November 2026. No decision has been made yet.

Proposal

Redevelopment and clearance of site to deliver data centre campus consisting of (a) free standing data centre buildings (b) energy, power, and water infrastructure (c) site access and internal roads (d) site security arrangements (e) hard and soft, green and blue, landscaping and infrastructure (f) other ancillary and auxiliary forms of development. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Dec 2025
✓
Validated
19 Dec 2025
✓
Consultation
27 Oct 2026
✓
Committee
5 Nov 2026
Decision
Not decided yet

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 8 Sept 2026; it is now day 339.

A re-consultation started on 27 Oct 2026. The council has not yet published the new comment deadline.

Going to planning committee

Thursday 26 November, 6pm

Planning Committee

Civic Offices, Elstree Way, Borehamwood, Hertfordshire, WD6 1WA

Item 5B on the agenda

The committee will decide this application in public. Most councils let objectors, supporters and the applicant speak if they register in advance, each by its own deadline.

Source: Hertsmere's committee agenda. The council can change the date or the agenda up to the meeting.

Planning committee

Deferred by Hertsmere Planning Committee on 5 Nov 2026.

Deferred by 8 votes to 4

No officer report was published for this decision; this summary is from the committee minutes.

  • Residents and the applicant’s team spoke, while members raised concerns about landscape, height, water and other impacts.
  • The committee voted 8 to 4 to defer the application on all grounds.
Read how the committee decided The proposed development, public concerns, member debate, vote and reasons for deferral.

Source: Plota analysis of Hertsmere's committee minutes of 5 Nov 2026.

Documents 172

Statements & assessments 51

PDF Ecology comments Consultee replies · 7 Oct 2026 View ↗ PDF Bng assessment Supporting Documents · 11 Sept 2026 View ↗ PDF Planning statement addendum Supporting Documents · 19 Aug 2026 View ↗ PDF Rev. d Amended ecological impact assessment Supporting Documents · 18 Aug 2026 View ↗ PDF Response to ecology comments Supporting Documents · 18 Aug 2026 View ↗ PDF Ecology Consultee replies · 31 Jul 2026 View ↗ PDF Rev. p03 Design and access statement Supporting Documents · 16 Jul 2026 View ↗ PDF Lead local flood authority response Consultee replies · 26 Jun 2026 View ↗ PDF Climate change & sustainability comments Consultee replies · 28 May 2026 View ↗ PDF Design development note - energy and sustainability Supporting Documents · 24 Mar 2026 View ↗ PDF Alternative sites assessment Supporting Documents · 19 Feb 2026 View ↗ PDF Data centre needs assessment and socio-economic impact assessment Supporting Documents · 19 Feb 2026 View ↗ PDF Arboriculture response Consultee replies · 13 Jan 2026 View ↗ PDF Statement of community involvement Supporting Documents · 5 Jan 2026 View ↗ PDF Planning statement Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 00 Environmental statement cover and contents Supporting Documents · 23 Dec 2025 View ↗ PDF Appendix 1.1 Environmental statement table of drawings Supporting Documents · 23 Dec 2025 View ↗ PDF Appendix 1.2 Environmental statement table of professional competencies Supporting Documents · 23 Dec 2025 View ↗ PDF Appendix 5.1 Environmental statement eia scoping request Supporting Documents · 23 Dec 2025 View ↗ PDF Appendix 6 Environmental statement air quality appendices Supporting Documents · 23 Dec 2025 View ↗ PDF Appendix 8.1 Environmental statement lvia methodology Supporting Documents · 23 Dec 2025 View ↗ PDF Appendix 8.11 Environmental statement landscape masterplan Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 1 Environmental statement introduction Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 2 Environmental statement site and local context Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 3 Environmental statement proposed development Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 4 Environmental statement consultation, alternatives and design evolution Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 5 Environmental statement approach to assessment Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 6 Environmental statement air quality Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 7 Environmental statement noise and vibration incl. appendices Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 8 Environmental statement figures Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 8 Environmental statement figures (low res) Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 8 Environmental statement landscape and visual effects Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 8 Environmental statement wirelines (low res) Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 8 Environmental statement ztv methodology Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 9 Environmental statement climate change Supporting Documents · 23 Dec 2025 View ↗ PDF Chapter 10 Environmental statement summary of mitigation, residual and interaction effects Supporting Documents · 23 Dec 2025 View ↗ PDF Environmental statement non-technical summary Supporting Documents · 23 Dec 2025 View ↗ PDF Heritage statement Supporting Documents · 23 Dec 2025 View ↗ PDF Heritage statement - hfp-bwe-xx-xx-rp-y-980008 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF Arboricultural report hfp-bwe-xx-xx-rp-y-980010 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF Archaeological assessment hfp-bwe-xx-xx-rp-y-980010 p03 Supporting Documents · 15 Dec 2025 View ↗ PDF Biodiversity net gain assessment hfp-bwe-xx-xx-rp-y-980006 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF Biodiversity net gain metric Supporting Documents · 15 Dec 2025 View ↗ PDF Design and access statement nwa-0576-hfp-xx-rp-a-000001 rev p01 11/12/2025 Supporting Documents · 15 Dec 2025 View ↗ PDF Ecological impact assessment hfp-bwe-xx-xx-rp-yf-980001 p03 Supporting Documents · 15 Dec 2025 View ↗ PDF Energy & sustainability statement hfp-bwe-xx-xx-rp-z-000001 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF Flood risk assessment and drainage strategy hfp-bwe-xx-xx-rp-y-98000 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF Instrusive geoenvironmental and geotechnical site assessment hfp-bwe-xx-xx-rp-u- Supporting Documents · 15 Dec 2025 View ↗ PDF Transport assessment hfp-bwe-xx-xx-rp-y-980002 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF Utilities statement hfp-bwe-xx-xx-rp-mep-980001 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF Whole life-cycle assessment hfp-bwe-xx-xx-rp-z-000002 p02 Supporting Documents · 15 Dec 2025 View ↗

Plans & drawings 73

PDF Amended Illustrative sketch landscape sections Amended Plan · 16 Jul 2026 View ↗ PDF Amended Illustrative sketch landscape sections sheet 2 Amended Plan · 16 Jul 2026 View ↗ PDF Amended Landscape masterplan Amended Plan · 16 Jul 2026 View ↗ PDF Amended Urban greening factor Amended Plan · 16 Jul 2026 View ↗ PDF 03002 amended Proposed sw overall site plan Amended Plan · 16 Jul 2026 View ↗ PDF 03003 amended Proposed sw overall site plan - level 00 Amended Plan · 16 Jul 2026 View ↗ PDF 90050 amended Fence overall layout Amended Plan · 16 Jul 2026 View ↗ PDF Cadent gas plan Consultee replies · 31 Dec 2025 View ↗ PDF Es chapter 8 figure 8.6 Ztv plan extracted Supporting Documents · 23 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-03001 p01 Site location plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-00-dr-a-03000-p01 Hp1 - ground floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF Landscape management and maintenance plan 1679-009a dec 2025 Supporting Documents · 15 Dec 2025 View ↗ PDF 1679/006c Landscape masterplan Superseded plan · 15 Dec 2025 View ↗ PDF 1679/004e Illustrative sketch landscape sections sheet 2 Superseded plan · 15 Dec 2025 View ↗ PDF 1679/003g Illustrative sketch landscape sections Superseded plan · 15 Dec 2025 View ↗ PDF Travel plan hfp-bwe-xx-xx-rp-y-980009 p02 Supporting Documents · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-zz-dr-a-03702 p02 Hp1 - facade bay study Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-zz-dr-a-03701 p01 Hp1- building sections Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-zz-dr-a-03700 p01 Hp1- building elevations Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-rf-dr-a-03060 p01 Hp1 - roof plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-05-dr-a-03050 p01 Hp1 - roof gantry plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-01-dr-a-03010 p01 Hp1- first to fourth floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp1-00-dr-a-03000 p01 Hp1- ground floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp2-zz-dr-a-03701 p01 Hp2 - building sections Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp2-zz-dr-a-03700 p01 Hp2 - building elevations Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp2-rf-dr-a-03060 p01 Hp2 - roof plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp2-05-dr-a-03050 p01 Hp2 - roof gantry plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp2-01-dr-a-03010 p01 Hp2 - first to fourth floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp2-00-dr-a-03000 p01 Hp2 - ground floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp3-zz-dr-a-03701 p01 Hp3 - building sections Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp3-zz-dr-a-03700 p01 Hp3 - building elevations Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp3-rf-dr-a-03060 p01 Hp3 -roof plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp3-05-dr-a-03050 p01 Hp3 -roof gantry level Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp3-01-dr-a-03010 p01 Hp3 - first to fourth floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp3-00-dr-a-03000 p01 Hp3 - ground floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss1-zz-dr-a-030800 p01 Substation 1 - sections Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss1-zz-dr-a-030700 p01 Substation 1 - elevations Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss1-zz-dr-a-030001 p01 Substation 1 - floor plans Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss1-00-dr-a-030000 p01 Substation 1 - site context plan - ground floor Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-zz-dr-a-030901 p01 Hp4 - ancillary facade bay study ? horizontal metal louvre system Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-zz-dr-a-030900 p01 Hp4 - ancillary facade bay study ? profiled perforated metal cladding Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-zz-dr-a-030800 p01 Hp4 - building sections Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-zz-dr-a-030700 p01 Hp4 - building elevations Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-rf-dr-a-030060 p01 Hp4 - roof plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-rf-dr-a-030050 p01 Hp4 - roof gantry plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-04-dr-a-030040 p01 Hp4 - fourth floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-03-dr-a-030030 p01 Hp4 - third floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-02-dr-a-030020 p01 Hp4 - second floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-01-dr-a-030010 p01 Hp4 - first floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-hp4-00-dr-a-030000 p01 Hp4 - ground floor plan Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss2-zz-dr-a-030800 p01 Substation 2 - sections Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss2-zz-dr-a-030700 p01 Substation 2 - elevations Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss2-zz-dr-a-030001 p01 Substation 2 - floor plans Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-ss2-00-dr-a-030000 p01 Substation 2 - site context plan - ground floor Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-05-dr-a-03004 p01 Vrc ? facade bay study Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-05-dr-a-03003 p01 Vrc ? plans, elevations and sections bulding Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-zz-dr-a-03801 p01 Site context sections Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03608 p01 Visualisation 8 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03607 p01 Visualisation 7 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03606 p01 Visualisation 6 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03605 p01 Visualisation 5 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03604 p01 Visualisation 4 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03603 p01 Visualisation 3 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03602 p01 Visualisation 2 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-sw-xx-vs-a-03601 p01 Visualisation 1 Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-90052 p01 Sw waste mangement overall layout Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-90051 p01 Sw parking provision Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-90050 p01 Sw fence overall layout Superseded plan · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-03701 p01 Site elevations Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-03007 p01 Existing site location plan enlarged Drawing/Plans · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-03003 p01 Sw overall site plan - level 00 Superseded plan · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-03002 p01 Sw overall site plan Superseded plan · 15 Dec 2025 View ↗ PDF 0567-nwa-pl-sw-dr-a-03001 p01 Site location plan Drawing/Plans · 15 Dec 2025 View ↗

Consultation & comments 40

PDF Suds response Consultee replies · 25 Sept 2026 View ↗ PDF Hmwt comment Consultee Comment · 19 Aug 2026 View ↗ PDF Radlett society & green belt association comments Consultee replies · 18 Aug 2026 View ↗ PDF Letchmore heath village trust latest objection Consultee replies · 13 Aug 2026 View ↗ PDF Ea response Consultee replies · 10 Aug 2026 View ↗ PDF Response note to ea Supporting Documents · 16 Jul 2026 View ↗ PDF Elstree aerodrome comments Consultee replies · 16 Jun 2026 View ↗ PDF Rsgba further response Consultee replies · 27 May 2026 View ↗ PDF A05 comment Consultee Comment · 5 May 2026 View ↗ PDF Pgra comment (objection) submitted online Consultee Comment · 20 Apr 2026 View ↗ PDF Elstree aerodrome response Consultee replies · 25 Mar 2026 View ↗ PDF Agent response to public comments Supporting Documents · 24 Mar 2026 View ↗ PDF Consultee comment submitted online Consultee Comment · 5 Feb 2026 View ↗ PDF Gate herts comments Consultee replies · 3 Feb 2026 View ↗ PDF Place services landscape response Consultee replies · 2 Feb 2026 View ↗ PDF British horse society response Consultee replies · 2 Feb 2026 View ↗ PDF Gate comment (objection) submitted online Consultee Comment · 2 Feb 2026 View ↗ PDF Letchmore heath village trust comments Consultee Comment · 30 Jan 2026 View ↗ PDF The gardens trust response Consultee replies · 29 Jan 2026 View ↗ PDF Patchett's green residents' association comment (objection) submitted online Consultee Comment · 28 Jan 2026 View ↗ PDF Radlett society & green belt association comment Consultee replies · 22 Jan 2026 View ↗ PDF Climate change response Consultee replies · 16 Jan 2026 View ↗ PDF National highways response Consultee replies · 15 Jan 2026 View ↗ PDF Highways response Consultee replies · 15 Jan 2026 View ↗ PDF Affinity water response Consultee replies · 15 Jan 2026 View ↗ PDF Thames water response Consultee replies · 15 Jan 2026 View ↗ PDF Consultee comment submitted online Consultee Comment · 14 Jan 2026 View ↗ PDF Met office comment Consultee replies · 13 Jan 2026 View ↗ PDF Cadent gas updated response Consultee replies · 13 Jan 2026 View ↗ PDF Cadent gas specification for safe working Consultee replies · 13 Jan 2026 View ↗ PDF Environment agency response Consultee replies · 13 Jan 2026 View ↗ PDF Natural england response Consultee replies · 13 Jan 2026 View ↗ PDF Psecc response Consultee replies · 8 Jan 2026 View ↗ PDF Active travel england response Consultee replies · 8 Jan 2026 View ↗ PDF Arch response Consultee replies · 7 Jan 2026 View ↗ PDF Cadent gas holding objection Consultee replies · 31 Dec 2025 View ↗ PDF Cadent gas response Consultee replies · 31 Dec 2025 View ↗ PDF Cadent gas specification for safe working Consultee replies · 31 Dec 2025 View ↗ PDF Uk power networks Consultee replies · 29 Dec 2025 View ↗ PDF Fire and rescue (hydrants) response Consultee replies · 29 Dec 2025 View ↗

All documents on the council site ↗

Site constraints 3

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Also on the record
Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a data centre?

Plota Sites searches every land parcel in England and Wales: 3,798 sites fit this search. On and off the market, free to search.

Land for data centres
Work with planning data?

Every application in Hertsmere - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hertsmere
Application type
Full Planning Permission
Received
15 Dec 2025
Validated
19 Dec 2025
Ward
Bushey St James
Case officer
Show
Target decision
20 Mar 2026
Agent
Savills

Decision outlook

Day 339, past the statutory target. 67% of full applications in Hertsmere are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 15 Nov 2026.

Day 339283 days past the 56-day target
29%decided within 8 weeks
80%approved
6%go to committee

Plota live figures for full applications decided by Hertsmere in the last twelve months, from validation. Hertsmere decision record →

Public comments

1,201comments received
1,195 objecting2 neutral4 supporting

100% object · above the UK average of 74%

2,140 neighbours consulted · Last counted 15 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14480602
Planning Portal ref
PP-14480602
Neighbours
27 Oct 2026
Consultation
27 Oct 2026
Comments by
8 Sept 2026
Site or press notice
16 Jan 2026
Committee
5 Nov 2026
Statutory expiry
20 Mar 2026
Env. assessment
No
Hertsmere
Planning Authority Score
3.3/10
Poor
#225 of 296 overall
Relevant to this application:
Householder decisions

Hertsmere is slower than most councils at deciding householder applications: #243 of 296 on speed. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hertsmere decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #57 of 296
94%
Householder approved
Above avg (90%) #108 of 296
49%
Decided in 8 weeks
Below avg (63%) #243 of 296
55%
Extended time limit
Above avg (41%) #249 of 296
84%
Minor dwellings approved
102 decided (1-9 homes)
75%
Major dwellings approved
8 decided (10+ homes)
89%
Change of use approved
27 decided
742
Total decisions
55 refused in the year to March 2026