BWTHYN Y WAWR, Ystumtuen, Aberystwyth, Ceredigion, SY23 3AE Data via plota.co.uk
Proposal
Installation of fibre optic cable from BT pole into the house, the cable will be attached to the building at the eaves on the northeast corner, taken access at high level tight to the underside of the soffit, then vertically down the external wall, behind the existing rainwater downpipe to ground level. The cable will turn the corner and cross the north gable elevation by approx. 1.5m, before entering the building at low level. All cables to be neatly clipped to the wall. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 4 Dec 2026, from Ceredigion's recent listed building works.
Documents 6
Statements & assessments 2
Plans & drawings 3
Application forms 1
Site constraints 3
Show the other 4 with distances
- 7 mClydfanGrade II
- 11 mCottage attached to ClydfanGrade II
- 24 mTelephone Call-boxGrade II
- 42 mEbenezer Wesleyan Chapel, forecourt wall and outbuildingGrade II
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in September 2024, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate
Every application in Ceredigion - and every UK council - as a live feed, an API, or a bulk CSV export.
Important details
- Council
- Ceredigion
- Application type
- Listed Building Consent
- Postcode
- SY23 3AE
- Received
- 10 Jul 2026
- Validated
- 21 Aug 2026
- Ward
- Melindwr ED
- Parish
- Blaenrheidol Community
- Case officer
- Show
- Target decision
- 16 Oct 2026
- Decision level
- Dirprwyedig / Delegated
- Applicant
- Show
- Agent
- Catalina Architecture + Design Ltd
Decision outlook
Day 94 of the 56-day target. Ceredigion usually decides listed building works by day 105.
Plota live figures for listed building works decided by Ceredigion in the last twelve months, from validation. Ceredigion decision record →
Consultation & key dates
- Comments by
- 28 Sept 2026
- Statutory expiry
- 16 Oct 2026
Historical activity at this location
3 nearby applications on record - archival context, not part of the live application.
Nearby activity
Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
BWTHYN Y WAWR, Ystumtuen, Aberystwyth, Ceredigion, SY23 3AE
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
The consultation period closed on 28 Sept 2026.