33 Canada Square, London, E14 Data via plota.co.uk

PA/26/01716/S - Non-material amendment (TCPA S96a) Registered

Proposal

Application for Non-Material amendment to planning permission ref: , Dated 27/03/2026. Non Material amendment(s) Sought: Description of development to be changed to "Refurbishment of the existing facade, including re-finishing of the aluminium cladding elements, enhancements to the north entrance and introduction of a new south-west corner entrance, enhancements to street-level elevations including the addition of a living wall on part of the southern elevation, retention of Class E use including retail kiosks at ground level, erection of a single-storey roof pavilion with terrace and plant, and associated works". The application also seeks permission to; reduce the size of the roof pavilion; remove flexible restaurant use at levels 15, 16 and 17; remove conditions 7, 9 and 10 which relate to the restaurant use; amend the north facade and elevation; carry out changes to the louvres. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 7 Oct 2026
Decision
Expected by 4 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 4 Nov 2026.

Documents 18

Plans & drawings 15

PDF DS6001-TPB-DA-05-L00-DR-04101 REV 01 PROPOSED LEVEL 00 GENERAL ARRANGEMENT PLAN Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-L17-DR-04101 REV 01 PROPOSED LEVEL 17 GENERAL ARRANGEMENT PLAN Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-L18-DR-04101 REV 01 PROPOSED LEVEL 18 GENERAL ARRANGEMENT PLAN Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-PL1-DR-04101 REV 01 PROPOSED LOWER GROUND GENERAL ARRANGEMENT PLAN Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-L00-DR-04211 REV 01 PROPOSED LEVEL 00 GENERAL ARRANGEMENT ELEVATION - NORTH Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-ROF-DR-04101 REV 01 PROPOSED ROOF LEVEL GENERAL ARRANGEMENT PLAN Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-LXX-DR-04204 REV 01 PROPOSED TYPICAL GENERAL ARRANGEMENT ELEVATION - WEST Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-LXX-DR-04302 REV 01 PROPOSED TYPICAL GENERAL ARRANGEMENT SECTION B-B Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-LXX-DR-04202 REV 01 PROPOSED TYPICAL GENERAL ARRANGEMENT ELEVATION - SOUTH Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-LXX-DR-04201 REV 01 PROPOSED TYPICAL GENERAL ARRANGEMENT ELEVATION - NORTH Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-LXX-DR-04301 REV 01 PROPOSED TYPICAL GENERAL ARRANGEMENT SECTION A-A Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-LXX-DR-04203 REV 01 PROPOSED TYPICAL GENERAL ARRANGEMENT ELEVATION - EAST Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-L00-DR-04212 REV 01 PROPOSED LEVEL 00 GENERAL ARRANGEMENT ELEVATION - SOUTH Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-L17-DR-04202 REV 01 PROPOSED LEVEL 17 GENERAL ARRANGEMENT ENLARGED ELEVATIONS 2 Current Plan · 8 Oct 2026 View ↗ PDF DS6001-TPB-DA-05-L17-DR-04201 REV 01 PROPOSED LEVEL 17 GENERAL ARRANGEMENT ENLARGED ELEVATIONS 1 Current Plan · 8 Oct 2026 View ↗

All documents on the council site ↗

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 7, 9, 10 variation sought

    • AmendmentApplication for Non-Material amendment, Dated. Non Material amendment(s) Sought: Description…This applicationPA/26/01716/S

Site constraints 11

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Canary Wharf. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Canary Wharf
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project about 418 m away: Thames Tideway Tunnel
The site is about 418 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 1500 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
1 listed building within 150 m of the postcode pin
Nearest: Quay Walls,copings and Butresses to Import Dock and Export Dock, Grade I, about 28 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 32 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 15 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area83,474 m² (898,506 sq ft)
Energy ratingD (asset rating 100)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in March 2026, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material amendment (TCPA S96a)
Postcode
E14 5LB
Received
around 7 Oct 2026
Validated
7 Oct 2026
Ward
Canary Wharf
Case officer
Show
Target decision
4 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Savills
Freehold owner
Show

Consultation & key dates

Statutory expiry
4 Nov 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.