Senator House 85 Queen Victoria Street London EC4V 4AB Data via plota.co.uk

25/01597/ADVT - Advertisement Consent Approved

Proposal

Installation and display of one internally illuminated fascia sign measuring 0.475m x 3.265m at a height of and 5.29m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Nov 2025
✓
Validated
25 Nov 2025
✓
Consultation
25 Nov 2025
✓
Approved
12 Mar 2026

Approved on 12 Mar 2026 · Delegated Decision · Last checked 8 Oct 2026

Documents 27

All documents on the council site ↗

Licence at this address

  • Licence Sodexo, Quilter Plc Premises licence · in force since 30 Sep 2026 Licensed hours: alcohol Mon-Fri until 23:00

Licensed hours are what the licence permits, not opening times.

Site constraints 10

Scheduled monument about 6 m away: Huggin Hill Roman bath house, 120m WNW of St James's Church
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 34 m away: Thames Tideway Tunnel
The site is about 34 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 160 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
7 listed buildings within 150 m of the postcode pin
Nearest: Police Public Callbox, Corner of Friday Street and Queen Victoria, Grade II, about 54 m from the postcode pin · 3 Grade I, 1 Grade II*, 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Also on the record
Wider setting of protected view 1A.2 Alexandra Palace viewing terrace to St Paul's Cathedral; 2A.1 Parliament Hill summit to St Paul's Cathedral; 3A.1 Kenwood viewing gazebo to St Paul's Cathedral; 4A.1 Primrose Hill summit to St Paul's Cathedral; 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; 6A.1 Blackheath Point to St Paul's Cathedral; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 18 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement Consent
Postcode
EC4V 4AB
Received
14 Nov 2025
Validated
25 Nov 2025
Ward
Vintry
Case officer
Show
Target decision
20 Jan 2026
Decision
Approved
Decision date
12 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Rolfe Judd Planning
Leaseholder
Show

How this decision compares

Decided in 107 days from validation, 29 days slower than City of London's median of 78 for signs and adverts. Approved, as 98% of signs and adverts here are.

33%decided within 8 weeks
98%approved
103decided in the last year

Plota live figures for signs and adverts decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14460492
Planning Portal ref
PP-14460492
Neighbours
11 Dec 2025
Consultation
25 Nov 2025
Comments by
12 Jan 2026
Site or press notice
9 Dec 2025
Committee
26 Mar 2026
Statutory expiry
20 Jan 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Other decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.