Street Record Folville Street Ashby Folville Data via plota.co.uk

26/00906/TCA - Trees Cons Area Section 211 notices Pending

Proposal

T087 Horse chestnut (Aesculus hippocastanum) Ganoderma spp. At base on west side. Significant hollowing on North, East and West sides at base when sounded with a hammer. Bleeding canker observed around stem. Reduce by 4-5m in height Timescale: 24-Jan-2027 (6 Months) T124 Horse chestnut (Aesculus hippocastanum) Major tear out wound (historic) on north side at approx. 1.5m above ground level. Ganoderma Spp fungal fruiting bodies proliferating from base on north side. Tree was either topped or pollarded in the past. Approx 10 west of the edge of the highway Re pollard to previous pruning points to reduce sail area/forces acting upon the base/root plate. Timescale: 17-Feb-2027 (6 Months) T137 Cherry (Prunus sp. 'Cherry') Dead tree Remove tree to ground level Timescale: 17-Feb-2027 (6 Months) T142 Sycamore (Acer pseudoplatanus) Major deadwood throughout crown. Foliage in contact with BT wires. Remove major deadwood throughout crown. Prune to clear BT wires by 0.5m Timescale: 17-Feb-2027 (6 Months) T143 Common ash (Fraxinus excelsior) Large tree with a large spread. Major deadwood in crown over car parking space. Over extended limb over highway. Foliage in contact with BT wires. Remove major deadwood over highway and car park. Reduce over- extended limb over highway by 3m. Prune to clear bt wires by 0.5m Timescale: 17-Feb-2027 (6 Months) T146 European lime (Tilia x europaea) Major deadwood over the highway. Hung up branches in the tree. Remove major deadwood and hung-up branches over the highway. Timescale: 17-Nov-2026 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Sept 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Oct 2026 and 6 Nov 2026, from Melton's recent tree and landscaping works.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Ashby Folville conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
2 listed buildings within 150 m; Radon affected area, class 2; National infrastructure project: Weston Marsh to East Leicestershire, at pre-application; Priority habitat 6 m away: Deciduous woodland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Melton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Melton
Application type
Trees Cons Area Section 211 notices
Received
28 Sept 2026
Validated
28 Sept 2026
Ward
Gaddesby
Parish
Gaddesby
Case officer
Show
Target decision
9 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Hill-fort Tree Care

Decision outlook

Day 11 of the 56-day target. Melton usually decides tree and landscaping works by day 36.

Day 1145 days to the 56-day target
85%decided within 8 weeks
100%approved
155decided in the last year

Plota live figures for tree and landscaping works decided by Melton in the last twelve months, from validation. Melton decision record →

Public comments

No public comments yet.

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15254105
Planning Portal ref
PP-15254105
Statutory expiry
9 Nov 2026
Env. assessment
No
Melton
Planning Authority Score
2.1/10
Poor
#269 of 296 councils
Relevant to this application:
Householder decisions

Melton is one of the slowest councils in England for householder decisions, ranking #296 out of 296. The council extends the time limit on 75% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Melton decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #60 of 296
94%
Householder approved
Above avg (90%) #112 of 296
11%
Decided in 8 weeks
Below avg (63%) #296 of 296
75%
Extended time limit
Above avg (41%) #292 of 296
87%
Minor dwellings approved
47 decided (1-9 homes)
94%
Major dwellings approved
16 decided (10+ homes)
78%
Change of use approved
9 decided
308
Total decisions
23 refused in the year to March 2026