2 Lechford Road Horley Surrey RH6 7NB Data via plota.co.uk

25/00593/HHOLD - Householder Application Approved

Proposal

Demolition of existing single-storey garage and lean-to, erection of a 2-storey 4.125m wide side extension to follow the footprint of the original garage. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 1 Apr 2025
✓
Consultation
10 Apr 2025
✓
Approved
23 May 2025

Approved on 23 May 2025 · Neighbourhood Development Manager · Last checked 22 Nov 2026

Documents 14

Plans & drawings 8

PDF 2 Lechford Road Horley RH6 7NB-Elevations & 3D Views - Existing & Proposed Plan - Existing and Proposed Elevations (Web) · 2 Apr 2025 View ↗ PDF 2 Lechford Road Horley RH6 7NB - 04 - First Floor Plan - Proposed - Current Revision.pdf | 2 Lechford Road Horley RH6 7NB - 04 - First Floor Plan - Proposed - Current Revision Plan - Proposed Floor Plan (Web) · 27 Mar 2025 View ↗ PDF 2 Lechford Road Horley RH6 7NB - 00B - Block Plan - Proposed - Current Revision.pdf | 2 Lechford Road Horley RH6 7NB - 00B - Block Plan - Proposed - Current Revision Plan - Block Plan (Web) · 27 Mar 2025 View ↗ PDF 2 Lechford Road Horley RH6 7NB - 01 - Ground Floor Plan - Existing - Current Revision.pdf | 2 Lechford Road Horley RH6 7NB - 01 - Ground Floor Plan - Existing - Current Revision Plan - Existing Floor Plan (Web) · 27 Mar 2025 View ↗ PDF 2 Lechford Road Horley RH6 7NB - 02 - Ground Floor Plan - Proposed - A.pdf | 2 Lechford Road Horley RH6 7NB - 02 - Ground Floor Plan - Proposed - A Plan - Proposed Floor Plan (Web) · 27 Mar 2025 View ↗ PDF 2 Lechford Road Horley RH6 7NB - 03 - First Floor Plan - Existing - Current Revision.pdf | 2 Lechford Road Horley RH6 7NB - 03 - First Floor Plan - Existing - Current Revision Plan - Existing Floor Plan (Web) · 27 Mar 2025 View ↗ PDF 2 Lechford Road Horley RH6 7NB - 00A - Block Plan - Existing - Current Revision.pdf | 2 Lechford Road Horley RH6 7NB - 00A - Block Plan - Existing - Current Revision Plan - Block Plan (Web) · 27 Mar 2025 View ↗ PDF Plan - Location Plan (Web) | LocationPlan.pdf | LocationPlan Plan - Location Plan (Web) · 27 Mar 2025 View ↗

All documents on the council site ↗

Site constraints 3

Air quality management area: AQMA No.3
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 377 m away: Gatwick Airport Northern Runway
The site is 377 m from the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Horley (Reigate and Banstead) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £447,500 in January 2025. Detached house, freehold.

3 January 2025£447,500

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area91 m² (980 sq ft)
Energy ratingD (61 out of 100), could reach B
PropertyDetached house, 5 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in May 2024, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Reigate - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Reigate
Application type
Householder Application
Postcode
RH6 7NB
Received
around 1 Apr 2025
Validated
1 Apr 2025
Ward
Horley Central And South
Parish
Horley Town Council
Case officer
Show
Target decision
27 May 2025
Decision
Approved with Conditions
Decision date
23 May 2025
Decision level
Neighbourhood Development Manager
Applicant
Show
Agent
Michael Redmond Architectural Design Ltd

How this decision compares

Decided in 52 days from validation, 4 days faster than Reigate's median of 56 for householder applications. Approved, as 94% of householder applications here are.

66%decided within 8 weeks
94%approved
514decided in the last year

Plota live figures for householder applications decided by Reigate in the last twelve months, from validation. Reigate decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13814261
Planning Portal ref
PP-13814261
Neighbours
10 Apr 2025
Consultation
10 Apr 2025
Comments by
3 May 2025
Statutory expiry
27 May 2025
Reigate
Planning Authority Score
7.3/10
Good
#52 of 296 overall
Relevant to this application:
Householder decisions

Reigate is faster than most councils at deciding householder applications: #70 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Reigate decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #160 of 296
93%
Householder approved
Above avg (90%) #135 of 296
76%
Decided in 8 weeks
Above avg (63%) #70 of 296
26%
Extended time limit
Below avg (41%) #35 of 296
71%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
74%
Change of use approved
31 decided
981
Total decisions
116 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.