Land Affected By TPO 415V - Between Ively Road, Wisley Gardens And Southern Way Farnborough Hampshire Data via plota.co.uk

25/00456/TPOPP - Tree Preservation Order via PP Approved

Proposal

Two Oak trees (T44 and T45 of TPO 415V) at land adjacent 13 Southern Way, crown reduce by no more than 3 metres and create a flowing silhouette Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Aug 2025
✓
Validated
1 Sept 2025
✓
Consultation
1 Sept 2025
✓
Approved
3 Oct 2025

Approved on 3 Oct 2025 · Delegated to Service Manager · Last checked 13 Nov 2026

Site constraints 3

National infrastructure project 155 m away: Southampton to London Pipeline Project
The site is 155 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Farnborough built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rushmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rushmoor
Application type
Tree Preservation Order via PP
Postcode
GU14 0RE
Received
30 Aug 2025
Validated
1 Sept 2025
Ward
Cove And Southwood
Case officer
Show
Target decision
27 Oct 2025
Decision
Permission Granted
Decision date
3 Oct 2025
Decision level
Delegated to Service Manager
Applicant
Show

How this decision compares

Decided in 32 days from validation, about the council's usual 35 days. Approved, as 96% of tree works here are.

98%decided within 8 weeks
96%approved
121decided in the last year

Plota live figures for tree works decided by Rushmoor in the last twelve months, from validation. Rushmoor decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14292954
Planning Portal ref
PP-14292954
Neighbours
1 Sept 2025
Consultation
1 Sept 2025
Comments by
22 Sept 2025
Site or press notice
1 Sept 2025
Statutory expiry
27 Oct 2025
Env. assessment
No
Rushmoor
Planning Authority Score
8.9/10
Excellent
#9 of 296 overall
Relevant to this application:
Householder decisions

Rushmoor is one of the fastest councils in England for householder decisions: #22 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rushmoor decision statistics
Based on MHCLG data, the nine months to December 2025
95%
Overall approval rate
Above avg (87%) #26 of 296
97%
Householder approved
Above avg (90%) #41 of 296
86%
Decided in 8 weeks
Above avg (63%) #22 of 296
26%
Extended time limit
Below avg (41%) #36 of 296
71%
Minor dwellings approved
14 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
7 decided
257
Total decisions
13 refused in the nine months to December 2025