Hartland Park Ively Road Fleet Data via plota.co.uk

26/01552/CON - Discharge of Conditions Registered

Proposal

Details pursuant to condition 32b (Sustainable Building Performance) of Planning Permission Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Sept 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 9 Nov 2026.

Comments are open until 12 Oct 2026

Comment on this application ↗

Site constraints 3

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 448 m away: Southampton to London Pipeline Project
The site is 448 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Priority habitat 25 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hart - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hart
Application type
Discharge of Conditions
Received
14 Sept 2026
Validated
14 Sept 2026
Ward
Fleet East Ward
Parish
Fleet Parish
Case officer
Show
Target decision
9 Nov 2026
Decision level
Delegated
Agent
DHA Planning

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
17/00471/OUT
Comments by
12 Oct 2026
Statutory expiry
9 Nov 2026
Env. assessment
No
Hart
Planning Authority Score
4.7/10
Below average
#165 of 296 councils
Relevant to this application:
Major dwellings

Hart ranks #116 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hart decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #223 of 296
86%
Householder approved
Below avg (90%) #244 of 296
71%
Decided in 8 weeks
Above avg (63%) #116 of 296
36%
Extended time limit
Below avg (41%) #111 of 296
64%
Minor dwellings approved
45 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
81%
Change of use approved
16 decided
698
Total decisions
114 refused in the year to March 2026