Hartland Park Ively Road Fleet Hampshire Data via plota.co.uk

26/00552/ADJ - Adjacent authority consultation Awaiting decision

Proposal

ADJACENT AUTHORITY CONSULTATION FROM HART: Minor Material Amendment (Section 73) application for the variation of condition numbers 1, 9 and 10 attached to application reference dated 12.08.2026 for amendments to reserved matters permission () dated 29.04.2022 for the approval of the appearance, landscaping, layout and scale pursuant to outline planning permission . Amendments include a revision to the approved house types and mix, including associated amendments to approved parking and landscaping within Phase 3 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
Decision
Target date was 4 Nov 2026

Under consideration

No decision has been issued yet. The council's target date, 4 Nov 2026, has passed.

Site constraints 3

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 841 m away: Southampton to London Pipeline Project
The site is 841 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rushmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rushmoor
Application type
Adjacent authority consultation
Received
14 Oct 2026
Validated
14 Oct 2026
Ward
Out Of Area
Case officer
Show
Target decision
4 Nov 2026
Decision level
Delegated
Applicant
Show

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
26/01738/AMCON
Statutory expiry
4 Nov 2026
Env. assessment
No
Rushmoor
Planning Authority Score
8.9/10
Excellent
#9 of 296 overall
Relevant to this application:
Householder decisions

Rushmoor is one of the fastest councils in England for householder decisions: #22 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rushmoor decision statistics
Based on MHCLG data, the nine months to December 2025
95%
Overall approval rate
Above avg (87%) #26 of 296
97%
Householder approved
Above avg (90%) #41 of 296
86%
Decided in 8 weeks
Above avg (63%) #22 of 296
26%
Extended time limit
Below avg (41%) #36 of 296
71%
Minor dwellings approved
14 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
7 decided
257
Total decisions
13 refused in the nine months to December 2025