5-6 Skinner Street Newport NP20 1GY Data via plota.co.uk

26/0658 - Listed Building Awaiting decision

Proposal

Listed building consent for existing unit to be divided back into two separate units no. 5 and no.6 including new shopfront entrance to the right-hand side for unit no. 6 Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
24 Aug 2026
Decision
Expected by 19 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 18 Oct 2026 and 26 Oct 2026, from Newport's recent commercial premises.

Site constraints 5

Grade II listed: Highbury Chambers
List entry 23147 · 12 m from the pin · 24 more listed buildings within 150 m (24 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 24 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
(Newport) Town Centre conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Special area of conservation 174 m away: River Usk / Afon Wysg
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 174 m away: River Usk (Lower Usk) / Afon Wysg (Wysg Isaf)
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Not affected
No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newport
Application type
Listed Building
Postcode
NP20 1GY
Received
24 Aug 2026
Validated
24 Aug 2026
Ward
Stow Hill
Case officer
Show
Applicant
Show
Agent
Evans Architectural Services

Decision outlook

Day 21 of the 56-day target. Newport usually decides commercial premises by day 57.

Day 2136 days to the predicted decision (day 57)
47%decided within 8 weeks
68%approved
6%go to committee

Plota live figures for commercial premises decided by Newport in the last twelve months, from validation. Newport decision record →

Public comments

No public comments yet.

Last counted 5 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15179054
Env. assessment
No