Land Affected By TPO 436V - At Haskins Gardens And Haskins Drive Farnborough Hampshire Data via plota.co.uk

26/00495/TPOPP - Tree Preservation Order via PP Registered

Proposal

Remove trees as per submitted plan 22. Scots Pine .24. Silver Birch. 25. Scots Pine .26. Scots Pine .27. Silver Birch .29. Silver Birch.30. Silver Birch ( All part of group G2 of TPO 436V) and 31. Silver Birch (part of group G1 of TPO 436V) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
✓
Validated
14 Sept 2026
✓
Consultation
14 Sept 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 19 Oct 2026, from Rushmoor's recent tree and landscaping works.

The consultation period closed on 5 Oct 2026.

Site constraints 2

National infrastructure project 670 m away: Southampton to London Pipeline Project
The site is 670 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Farnborough built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rushmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rushmoor
Application type
Tree Preservation Order via PP
Received
11 Sept 2026
Validated
14 Sept 2026
Ward
St John's
Case officer
Show
Target decision
9 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Merlin Estates Ltd

Decision outlook

Day 25 of the 56-day target. Rushmoor usually decides tree and landscaping works by day 35.

Day 2531 days to the 56-day target
98%decided within 8 weeks
95%approved
88decided in the last year

Plota live figures for tree and landscaping works decided by Rushmoor in the last twelve months, from validation. Rushmoor decision record →

Public comments

No public comments yet.

22 neighbours consulted · Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15219187
Planning Portal ref
PP-15219187
Neighbours
14 Sept 2026
Consultation
14 Sept 2026
Comments by
5 Oct 2026
Site or press notice
14 Sept 2026
Statutory expiry
9 Nov 2026
Env. assessment
No
Rushmoor
Planning Authority Score
8.9/10
Excellent
#9 of 296 councils
Relevant to this application:
Householder decisions

Rushmoor is one of the fastest councils in England for householder decisions, ranking #22 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rushmoor decision statistics
Based on MHCLG data, the nine months to December 2025
95%
Overall approval rate
Above avg (87%) #26 of 296
97%
Householder approved
Above avg (90%) #41 of 296
86%
Decided in 8 weeks
Above avg (63%) #22 of 296
26%
Extended time limit
Below avg (41%) #36 of 296
71%
Minor dwellings approved
14 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
7 decided
257
Total decisions
13 refused in the nine months to December 2025