Childrens Nursery Churchill Street Wallsend Tyne And Wear NE28 7TG Data via plota.co.uk

26/01614/TPO - tree preservation order tree works Awaiting decision

Proposal

T1 Ash tree Full removal. T2 lime tree 2m reduction. Churchill Street Wallsend TPO 2011 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Nov 2026
Decision
Expected by 12 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 25 Dec 2026, from North Tyneside's recent tree and landscaping works.

Site constraints 4

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: 40 m away (reference 431567-003).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
National infrastructure project 999 m away: A19/A1058 Coast Road Junction Improvement
The site is 999 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Wallsend built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
tree preservation order tree works
Postcode
NE28 7TG
Received
17 Nov 2026
Validated
17 Nov 2026
Ward
Howdon
Parish
Wallsend
Case officer
Show
Target decision
12 Jan 2027
Applicant
Show
Agent
Treescape North East

Decision outlook

Day 6 of the 56-day target. North Tyneside usually decides tree and landscaping works by day 38.

Day 650 days to the 56-day target
88%decided within 8 weeks
86%approved
129decided in the last year

Plota live figures for tree and landscaping works decided by North Tyneside in the last twelve months, from validation. North Tyneside decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15377318
Planning Portal ref
PP-15377318
Statutory expiry
12 Jan 2027
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 overall
Relevant to this application:
Householder decisions

North Tyneside is faster than most councils at deciding householder applications: #35 of 296 on speed. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026