Glebe Farm Kinwarton Alcester B49 6HB Data via plota.co.uk

26/00714/LBC - Listed Building Consent Approved

Proposal

The conversion of an area of an existing outbuilding to enlarge the kitchen and create a separate boot room. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Mar 2026
✓
Approved
11 Sept 2026

Approved on 11 Sept 2026 · Last checked 12 Sept 2026

Site constraints 5

Grade II listed: Glebe Farmhouse and Attached Former Cowhouse
List entry 1355407 · 4 m away · 6 more listed buildings within 150 m (1 Grade II*, 5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 6 with distances
Historic England ↗
Green belt: Birmingham
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Public footpath 22 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Scheduled monument 60 m away: Standing cross in St Mary's churchyard
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Not affected
Outside flood zones 2 and 3

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area82 m² (883 sq ft)
Energy ratingE (asset rating 103)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Stratford on Avon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
B49 6HB
Received
19 Mar 2026
Validated
19 Mar 2026
Ward
Kinwarton
Parish
Kinwarton
Case officer
Show
Target decision
11 Sept 2026
Decision date
11 Sept 2026
Applicant
Show
Agent
Fisher German

How this decision compares

Decided in 176 days from validation, 120 days slower than Stratford on Avon's median of 56 for extensions. Approved, as 96% of extensions here are.

53%decided within 8 weeks
96%approved
643decided in the last year

Plota live figures for extensions decided by Stratford on Avon in the last twelve months, from validation. Stratford on Avon decision record →

Consultation & key dates

Consultation
3 Jul 2026
Comments by
30 Jul 2026
Site or press notice
9 Jul 2026
Stratford on Avon
Planning Authority Score
5.5/10
Average
#121 of 296 councils
Relevant to this application:
Other decisions

Stratford on Avon ranks #142 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Stratford on Avon decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #94 of 296
95%
Householder approved
Above avg (90%) #93 of 296
67%
Decided in 8 weeks
Above avg (63%) #142 of 296
42%
Extended time limit
Above avg (41%) #166 of 296
82%
Minor dwellings approved
146 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
87%
Change of use approved
53 decided
1,257
Total decisions
98 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.