Paradise House Grantchester Street Cambridge Cambridgeshire CB3 9HY Data via plota.co.uk

25/0922/TTPO - Works to TPO trees Approved

Proposal

Large Ash - Reduce height by 5 - 6m reduce spread on all sides by 3 - 4m to shape Remove deadwood from remainder of crown Reason - Extensive dieback through crown and limb failure in the last 2 months Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2025
✓
Approved
24 Oct 2025

Approved on 24 Oct 2025 · Tree - Delegated (CBG) · Last checked 12 Oct 2026

Site constraints 11

Green belt: Cambridge
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Newnham Croft conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Local nature reserve 21 m away: Paradise
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Cambridge Core Area; Tree preservation order 9 m away: Paradise House, Grantchester Street; Flood defence 29 m away (natural high ground, designed for a 1 in 200 year flood); Priority habitat 8 m away: Deciduous woodland; Inside the Cambridge (Cambridge) built-up area; National infrastructure project 1.5 km away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area261 m² (2,809 sq ft)
Energy ratingD (59 out of 100), could reach C
PropertyDetached house, 10 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in June 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Works to TPO trees
Postcode
CB3 9HY
Received
4 Sept 2025
Validated
4 Sept 2025
Ward
Newnham
Case officer
Show
Target decision
30 Oct 2025
Decision
Granted Permission
Decision date
24 Oct 2025
Decision level
Tree - Delegated (CBG)
Applicant
Show
Agent
Eastern Tree Surgery Ltd

How this decision compares

Decided in 50 days from validation, 14 days slower than Cambridge's median of 36 for tree and landscaping works. Approved, as 96% of tree and landscaping works here are.

94%decided within 8 weeks
96%approved
662decided in the last year

Plota live figures for tree and landscaping works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
30 Oct 2025
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 overall
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions: #21 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.