25/03347/FUL - Full Application Approved at committee

Approved at planning committee on 5 August 2026, subject to a legal agreement. The council issues its decision notice once the agreement is signed.

Proposal

Erection of 4 no. terraced dwellings (Class C3) and the conversion and extension of existing buildings to create 4 no. residential dwellings (Class C3) with associated vehicular access, associated parking and landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Aug 2025
✓
Validated
18 Sept 2025
✓
Committee
5 Aug 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 426.

Planning committee

Decided by Bath Planning Committee on 5 Aug 2026. The council has not yet issued its decision notice.

Approved

As officers recommended.

  • Supporters welcomed housing on a sustainable site, while objections raised overdevelopment, overlooking, heritage and traffic concerns.
  • The committee voted unanimously to delegate permission, subject to tree funding and an amended highway condition.
Read how the committee decided The proposal, site history, officers’ assessment, public comments, committee debate, vote and final decision. Includes the meeting recording, from 3:08:29 where this application was taken

Source: Plota analysis of Bath's committee minutes of 5 Aug 2026.

Site constraints 8

Paulton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Paulton (including Paulton Basin)
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Public footpath about 23 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
10 listed buildings within 150 m of the postcode pin
Nearest: Elm Hayes, Grade II, about 38 m from the postcode pin · 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
Also on the record
Coalfield, development low risk area; Inside the Paulton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Full Application
Postcode
BS39 7QJ
Received
25 Aug 2025
Validated
18 Sept 2025
Ward
Paulton
Parish
Paulton
Case officer
Show
Target decision
20 Nov 2026
Applicant
Show
Agent
Burnford Architecture

Decision outlook

Day 426, past the statutory target. 54% of new homes in Bath are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 426370 days past the 56-day target
32%decided within 8 weeks
87%approved
94decided in the last year

Plota live figures for new homes decided by Bath in the last twelve months, from validation. Bath decision record →

Consultation & key dates

Planning Portal ref
PP-14205506
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 councils
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications, ranking #236 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026