Indian Queens Sub-station St Dennis St Austell Cornwall PL26 8BY Data via plota.co.uk

PA26/02913 - Full application Approved

Proposal

Sections of cabling to connect the Indian Queens Battery Energy Storage System to the Indian Queens Substation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Apr 2026
✓
Consultation
3 Jun 2026
✓
Approved
22 Sept 2026

Approved on 22 Sept 2026 · Self Sign Off (Area Team) · Last checked 30 Sept 2026

Documents 23

Statements & assessments 18

PDF 15821_M02B BNG STATUTORY METRIC Biodiversity Net Gain · 15 Sept 2026 View ↗
PDF Commenter’s name hidden Show Representations Received · 11 Sept 2026 View ↗
PDF 15821_R04D_JS REV D BNG REPORT Biodiversity Net Gain · 30 Jul 2026 View ↗
PDF Commenter’s name hidden Show Representations Received · 17 Jul 2026 View ↗
PDF 26-240-60 REVISION 03 FLOOD RISK AND DRAINAGE STATEMENT Assessment - Flood Risk · 30 Jun 2026 View ↗ PDF CABLE ROUTE CONSTRUCTION SURFACE WATER MANAGEMENT PLAN Assessment - Flood Risk · 30 Jun 2026 View ↗ PDF BIODIVERSITY NET GAIN REPORT Biodiversity Net Gain · 30 Jun 2026 View ↗ PDF WORKBOOK - THE STATUTORY BIODIVERSITY METRIC Biodiversity Net Gain · 30 Jun 2026 View ↗
PDF Commenter’s name hidden Show Representations Received · 3 Jun 2026 View ↗
PDF SUPPORTING STATEMENT WITH APPENDICES Statement - Planning · 29 Apr 2026 View ↗ PDF EV-3947-1-TPP REV D TREE PROTECTION PLAN Tree Survey/Report · 29 Apr 2026 View ↗ PDF BIODIVERSITY METRIC Biodiversity Net Gain · 29 Apr 2026 View ↗ PDF ECOLOGICAL IMPACT ASSESSMENT Assessment - Ecological · 29 Apr 2026 View ↗ PDF BIODIVERSITY NET GAIN REPORT Biodiversity Net Gain · 29 Apr 2026 View ↗ PDF ARBORICULTURAL MONITORING REPORT Tree Survey/Report · 29 Apr 2026 View ↗ PDF ARBORICULTURAL METHOD STATEMENT Tree Survey/Report · 29 Apr 2026 View ↗ PDF SOIL GAS AND GROUND CONTAMINATION ASSESSMENT Assessment - Land Contamination · 29 Apr 2026 View ↗ PDF FLOOD RISK AND DRAINAGE STATEMENT Assessment - Flood Risk · 29 Apr 2026 View ↗

Consultation & comments 2

PDF Commenter’s name hidden Show Representations Received · 20 May 2026 View ↗
PDF Commenter’s name hidden Show Representations Received · 20 May 2026 View ↗

All documents on the council site ↗

Associated applications 3

Site constraints 8

Special area of conservation 70 m away: Breney Common and Goss & Tregoss Moors
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI 70 m away: Mid Cornwall Moors SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Nature recovery project: G7 Legacy; National infrastructure project 16 m away: The Trelavour Lithium Project, at pre-application; Priority habitat 20 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area390 m² (4,198 sq ft)
Energy ratingE (asset rating 121)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in January 2018, the latest held for this property. The building may have changed since. View the certificate

Looking for land for battery storage?

Plota Sites searches every land parcel in England and Wales: 9,119 sites fit this search. On and off the market, free to search.

Land for battery storage
Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Full application
Postcode
PL26 8BY
Received
29 Apr 2026
Validated
29 Apr 2026
Ward
St Dennis And St Enoder
Parish
St. Dennis
Case officer
Show
Target decision
24 Jun 2026
Decision
Approved with conditions
Decision date
22 Sept 2026
Decision level
Self Sign Off (Area Team)
Applicant
Show
Agent
DWD Ltd

How this decision compares

Decided in 146 days from validation, 91 days slower than Cornwall's median of 55 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

67%decided within 8 weeks
98%approved
376decided in the last year

Plota live figures for utility and infrastructure works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 30 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14751356
Planning Portal ref
PP-14751356
Comments by
24 Jun 2026
Site or press notice
3 Jun 2026
Statutory expiry
24 Jun 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 overall
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications: #64 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.