96 - 98 King Street London W6 0QW Data via plota.co.uk

REGISTERED 2026/00007/NMAT - Non-Material Amendment Submission
Date received
8 Jan 2026
Date validated
8 Jan 2026
Postcode
W6 0QW
Type
Non-Material Amendment Submission

Description

Non-material amendment to planning application ref: granted under appeal ref: APP/ dated 5th April 2023 for the 'Demolition of the existing building and erection of a part-three, part-four storey building to provide Class E (a) (b) (c) at ground floor level with 16 no. self-contained flats at ground, first, second, and third floor levels with associated rooftop plant.' Amendments to the approved drawings to include: Front Elevation: Change to point of entry to Flat 1 to be located to the front and not internal, alterations to commercial ground floor glazing pattern to add in fire break, change to reduce window cill, slight change to 3no windows setting out to three-storey element; Rear Elevation: Change to rear fenestration pattern; Residential communal Area: Changes to entry spaces to provide ventilated lobbies, change to stairwell to provide clear lift space, change to rear & bin lobbies to meet turning of bins & bicycles to provide a 'protected lobby', change to post boxes, change to bike store to provide clear zones, new electrical risers and smoke vents, and enlarged lift and stair lobbies; Commercial unit: Change to commercial unit to address residential circulation space; Residential flats: Change to entry of Flat, enlarged lift, updates to flats layouts, and roof plant updated to accord with details for condition 6. Data via plota.co.uk

Last checked

Associated applications 5

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Hammersmith Town Hall conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Archaeological priority area: proto-town
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Hammersmith Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Inside the Hammersmith and Fulham built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026