Roos Village Store And Post Office 4 - 5 Main Street Roos East Riding Of Yorkshire HU12 0HB Data via plota.co.uk

25/03041/PLF - Full Planning Permission Approved

Proposal

Installation of new shop entrance door with access ramp and railings to replace existing windows and repositioning of shutter within door opening and installation of surround and lead capping to existing entrance door (part retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2025
✓
Validated
20 Nov 2025
✓
Approved
14 Jan 2026

Approved on 14 Jan 2026 · Delegated Decision · Last checked 7 Oct 2026

Licence at this address

Licensed hours are what the licence permits, not opening times.

Site constraints 5

Public footpath 4 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Roos Main Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Roos built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area190 m² (2,045 sq ft)
Energy ratingD (asset rating 82)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in September 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
HU12 0HB
Received
21 Oct 2025
Validated
20 Nov 2025
Ward
South East Holderness
Parish
Roos Parish Council
Case officer
Show
Target decision
15 Jan 2026
Decision
Approve
Decision date
14 Jan 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Sutton Design Ltd

How this decision compares

Decided in 55 days from validation, about the council's usual 55 days. Approved, as 90% of full applications here are.

89%decided within 8 weeks
90%approved
1,507decided in the last year

Plota live figures for full applications decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
19 Dec 2025
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 overall
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions: #7 of 296 on speed. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.