The Nook Fairford Road Downington Lechlade Gloucestershire GL7 3DL Data via plota.co.uk

26/02160/TCONR - Works to trees in conservation areas Approved

Proposal

Prunus. The tree is half dead and the other half is dying. Having sought advice from Arboreal Tree Surgeons we have been advised to have it removed. The dead branches are brittle and could drop onto the public footpath Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
17 Jul 2026
Approved
5 Aug 2026

Approved on 5 Aug 2026 · Delegated Decision · Last checked 6 Aug 2026

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Lechlade Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath 10 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
3 listed buildings within 150 m
Nearest: Bridge House, Grade II, 57 m away · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Also on the record
Scheduled monument 234 m away: Multi-period settlement, cemetery, and ceremonial complex W of Lechlade; Inside the Lechlade-on-Thames built-up area; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cotswold - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cotswold
Application type
Works to trees in conservation areas
Postcode
GL7 3DL
Received
17 Jul 2026
Validated
17 Jul 2026
Ward
Lechlade, Kempsford & Fairford South
Parish
Lechlade
Case officer
Show
Target decision
28 Aug 2026
Decision
No objection
Decision date
5 Aug 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 19 days from validation, 9 days faster than Cotswold's median of 28 for tree and landscaping works. Approved, as 98% of tree and landscaping works here are.

96%decided within 8 weeks
98%approved
522decided in the last year

Plota live figures for tree and landscaping works decided by Cotswold in the last twelve months, from validation. Cotswold decision record →

Public comments

No public comments yet.

Last counted 6 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15090797
Env. assessment
No
Cotswold
Planning Authority Score
3.5/10
Below average
#218 of 296 councils
Relevant to this application:
Other decisions

Cotswold is slower than most councils at deciding householder applications, ranking #219 out of 296. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cotswold decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #128 of 296
92%
Householder approved
Above avg (90%) #150 of 296
53%
Decided in 8 weeks
Below avg (63%) #219 of 296
48%
Extended time limit
Above avg (41%) #212 of 296
74%
Minor dwellings approved
123 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
84%
Change of use approved
38 decided
1,252
Total decisions
138 refused in the year to March 2026