Land On The South Side Of Ringmore Road Shaldon Devon TQ14 0ES Data via plota.co.uk

25/01620/CAN - Conservation Area Notifications Approved

Proposal

T1: Birch tree - Dismantle and fell / tree dead T2: Willow tree - Reduce by approximately Half Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2025
✓
Validated
1 Oct 2025
✓
Approved
12 Nov 2025

Approved on 12 Nov 2025 · Delegated Decision · Last checked 2 Nov 2026

Site constraints 7

Grade II listed: Doone Cottage
List entry 1269176 · 0 m away · 11 more listed buildings within 150 m (11 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 11 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Ringmore conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
Radon affected area, class 3; Flood defence 22 m away (wall); Inside the Shaldon built-up area; Priority habitat 27 m away: Mudflats.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Teignbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Conservation Area Notifications
Postcode
TQ14 0ES
Received
30 Sept 2025
Validated
1 Oct 2025
Ward
Shaldon And Stokeinteignhead
Parish
SHALDON
Case officer
Show
Target decision
12 Nov 2025
Decision
CONSERVATION AREA NOTIFICATION APPROVAL
Decision date
12 Nov 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Southern Tree Services Ltd

How this decision compares

Decided in 42 days from validation, 6 days faster than Teignbridge's median of 48 for tree and landscaping works. Approved, as 96% of tree and landscaping works here are.

88%decided within 8 weeks
96%approved
309decided in the last year

Plota live figures for tree and landscaping works decided by Teignbridge in the last twelve months, from validation. Teignbridge decision record →

Public comments

No public comments yet.

Last counted 2 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
Teignmouth, Ringmore
Statutory expiry
12 Nov 2025
Env. assessment
No
Teignbridge
Planning Authority Score
6.1/10
Average
#102 of 296 overall
Relevant to this application:
Other decisions

Teignbridge is faster than most councils at deciding householder applications: #39 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Teignbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Teignbridge decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #262 of 296
82%
Householder approved
Below avg (90%) #270 of 296
80%
Decided in 8 weeks
Above avg (63%) #39 of 296
26%
Extended time limit
Below avg (41%) #37 of 296
60%
Minor dwellings approved
83 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
13 decided
716
Total decisions
141 refused in the year to March 2026