Clarence Court,Cambridge Grove, London, W6 0FY Data via plota.co.uk

P/2026/02392/NMAT - Non-Material Amendment Submission REGISTERED: Under Assessment

Proposal

Non-material amendment to planning permission ref: granted 23rd November 2021 for the 'Replacement of existing windows and doors with new timber framed double glazed windows and doors to all elevations' to allow amendments to the materials of doors and window framed to be changed from timber frame to timber effect uPVC frame doors and windows. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Validated
16 Sept 2026
Decision
Expected by 11 Nov 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 11 Nov 2026.

Documents 14

All documents on the council site ↗

Associated applications 2

  • Part of

    Fullcouncil archive
    • AmendmentNon-material amendment for the 'Replacement of existing windows and doors with new timber…This applicationP/2026/02392/NMAT

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Hammersmith Town Hall conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Archaeological priority area: proto-town
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Hammersmith Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 25 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment Submission
Postcode
W6 0FY
Received
15 Sept 2026
Validated
16 Sept 2026
Ward
Hammersmith Broadway
Case officer
Show
Applicant
Show
Freehold owner
Show

Consultation & key dates

Consultation
16 Sept 2026
Statutory expiry
14 Oct 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.