Lyric Theatre Hammersmith, Lyric Square, London, W6 0QL Data via plota.co.uk

REGISTERED P/2026/01522/ADV - Advertisement
Date received
26 May 2026
Date validated
25 Nov 2026
Postcode
W6 0QL
Type
Advertisement

Description

Display of various signs around the main entrance canopy area comprising of: 1no internally illuminated digital led screen (displayed to internal shopfront glazing) and externally illuminated fascia lettering sign to eastern elevation, 1no internally illuminated poster sign to southern elevation and 1no externally illuminated poster sign to northern elevation of the main entrance canopy area. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision between 27 Jan 2027 and 28 Feb 2027, from Hammersmith and Fulham's recent signs and adverts.

Day 2 of the 56-day target. Hammersmith and Fulham usually decides signs and adverts by day 68.

Day 266 days to the predicted decision (day 68)
32%decided within 8 weeks
93%approved
77decided in the last year

Plota live figures for signs and adverts decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 47 m away: Thames Tideway Tunnel
The site is 47 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Hammersmith Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Conservation area 35 m away: Hammersmith Broadway; 3 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 25 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,817 m² (30,322 sq ft)
Energy ratingC (asset rating 55)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2015, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.