Under Consultation OTH/2026/0902 - Consent for Works under a Tree Preservation Order
Date received
around 30 Sept 2026
Date validated
30 Sept 2026
Postcode
OL12 7RB
Type
Consent for Works under a Tree Preservation Order

Description

Works to one protected Sycamore Tree (T1) under TPO236 as follows:- Crown lift: Selectively remove low-growing branches and newer growth below the first major structural branch, achieving approximately 4.5 metres clearance above ground level. The first major structural branch will be retained. • Lateral crown reduction: Reduce the lateral branches growing towards the new development by approximately 2–3 metres, measured from their existing branch tips, pruning back to suitable lateral growth points. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision between 13 Nov 2026 and 20 Nov 2026, from Rochdale's recent tree works.

Day 9 of the 56-day target. Rochdale usually decides tree works by day 50.

Day 947 days to the 56-day target
76%decided within 8 weeks
88%approved
17decided in the last year

Plota live figures for tree works decided by Rochdale in the last twelve months, from validation. Rochdale decision record →

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; National infrastructure project: Calderdale Energy Park, at pre-application; 1 listed building within 150 m of the postcode pin; Inside the Rochdale built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 8 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rochdale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Rochdale
Planning Authority Score
2.4/10
Poor
#259 of 296 councils
Relevant to this application:
Householder decisions

Rochdale is slower than most councils at deciding householder applications, ranking #215 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rochdale decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #176 of 296
88%
Householder approved
Below avg (90%) #221 of 296
54%
Decided in 8 weeks
Below avg (63%) #215 of 296
52%
Extended time limit
Above avg (41%) #237 of 296
81%
Minor dwellings approved
52 decided (1-9 homes)
95%
Major dwellings approved
19 decided (10+ homes)
78%
Change of use approved
60 decided
609
Total decisions
82 refused in the year to March 2026