Mill House, Mill Lane, Fosdyke, Boston, PE20 2BL Data via plota.co.uk

B/26/0155 - Full Planning Permission Approved

Proposal

Proposed rear and side extension and alterations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Mar 2026
✓
Validated
13 Apr 2026
✓
Consultation
27 Apr 2026
✓
Approved
28 May 2026

Approved on 28 May 2026 · Delegated Decision · Last checked 24 Sept 2026

Associated applications 2

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Scheduled monument 74 m away: Churchyard cross, All Saints' churchyard
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Public footpath 25 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project 796 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 796 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, 265 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
2 listed buildings within 150 m
Nearest: Church of All Saints, Grade II, 52 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Heritage at risk 51 m away: Church of All Saints, Old Main Road; Inside the Fosdyke built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £65,000 in March 1995. Detached house, freehold.

21 March 1995£65,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area156 m² (1,679 sq ft)
Energy ratingG (18 out of 100), could reach D
PropertyDetached house, 6 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, oil
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in June 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Boston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Boston
Application type
Full Planning Permission
Postcode
PE20 2BL
Received
30 Mar 2026
Validated
13 Apr 2026
Ward
Five Village Ward
Parish
Fosdyke
Case officer
Show
Target decision
8 Jun 2026
Decision
Approved
Decision date
28 May 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 45 days from validation, 10 days faster than Boston's median of 55 for extensions. Approved, as 96% of extensions here are.

69%decided within 8 weeks
96%approved
104decided in the last year

Plota live figures for extensions decided by Boston in the last twelve months, from validation. Boston decision record →

Public comments

No public comments yet.

22 neighbours consulted · Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
27 Apr 2026
Consultation
27 Apr 2026
Comments by
14 May 2026
Site or press notice
22 Apr 2026
Statutory expiry
8 Jun 2026
Env. assessment
No

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.