Land North Of, Old Main Road, Fosdyke, Boston Data via plota.co.uk

B/25/0505/CD1 - Discharge of Planning Conditions Awaiting decision

Proposal

Application to discharge Conditions C6 (Foul Drainage Scheme), C7 (Archaeological Investigation), C8 (Surface Water Drainage Scheme), C9 (CEMP) and BNG Provision of permission B/25/0505 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2026
✓
Validated
24 Sept 2026
Decision
Expected by 19 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 19 Nov 2026.

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 433 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 433 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, 204 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Fosdyke built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Planning Conditions
Received
21 Aug 2026
Validated
24 Sept 2026
Case officer
Show
Target decision
19 Nov 2026
Applicant
Show
Agent
Origin Design Studio Ltd

Public comments

No public comments yet.

Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
19 Nov 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026