Charing Cross Hospital Fulham Palace Road London W6 8RF Data via plota.co.uk

2025/01625/FUL - Full Planning Application Approved

Proposal

Erection of a raised plant deck at first floor level screened by 2.6 metre high louvred panels, comprising of plant including air handling units and chillers, positioned within an external courtyard towards the northern part of the hospital building; installation of ductwork to facilitate the proposed plant, running up the face of the building and spanning across an adjacent flat roof. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Jun 2025
✓
Validated
12 Aug 2025
✓
Approved
20 Oct 2025

Approved on 20 Oct 2025 · Last checked 19 Oct 2026

Documents 24

Plans & drawings 20

PDF ANTI-VIBTRATION MOUNTS Drawing · 9 Oct 2025 View ↗ PDF SPECIFICATIONS FOR PROPOSED PLANT - CONDENSER TYPE Drawing · 30 Jun 2025 View ↗ PDF CHARING CROSS HOSPITAL FRA AND WMS P01 Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-210100 P1 EXISTING SITE PLAN Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-210101 P1 PROPOSED SITE PLAN Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-210102 P1 SITE LOCATION PLAN Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-211001 P1 00 LEVEL EXISTING COURTYARD PLAN Drawing · 13 Jun 2025 View ↗ PDF CIL FORM 1 ADDITIONAL INFO 12.06.2025 Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-212001 P1 00 LEVEL EXISTING COURTYARD ELEVATIONS Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-230010 P1 00 LEVEL PROPOSED COURTYARD PLAN Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-232000 P1 00 LEVEL PROPOSED COURTYARD ELEVATIONS 1 OF 2 Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-IWD-XX-00-DR-A-232001 P1 00 LEVEL PROPOSED COURTYARD ELEVATIONS 2 OF 2 Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-PHG-XX-00-DR-S-S011_P3 COLUMN PLAN LAYOUT Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-PHG-XX-01-DR-S-S012_P3 PLANT DECK LEVEL Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-PHG-XX-BG-DR-S-S010_P3 PROPOSED FOUNDATION PLAN Drawing · 13 Jun 2025 View ↗ PDF CXLINAC-PHG-XX-ZZ-DR-S-S013_P3 3D VIEWS Drawing · 13 Jun 2025 View ↗ PDF ANNOTATED HARDSTANDING PLAN Drawing · 13 Jun 2025 View ↗ PDF 42161.2B PHX OPTION - PROPOSED AIR HANDLING UNIT DETAILS Drawing · 13 Jun 2025 View ↗ PDF A0-CXH-P10457-ETA-RT-01-DR-M-20002-(T1) VENTILATION LAYOUT - PLANT DECK Drawing · 13 Jun 2025 View ↗ PDF A0-CXH-P10457-ETA-RT-01-DR-M-30002-(T1) MECHANICAL SERVICES PIPEWORK LAYOUT - PL Drawing · 13 Jun 2025 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
1 listed building within 150 m; Conservation area 83 m away: Crabtree; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W6 8RF
Received
13 Jun 2025
Validated
12 Aug 2025
Ward
Fulham Reach
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
20 Oct 2025
Applicant
Show
Freehold owner
Show

How this decision compares

Decided in 69 days from validation, 8 days faster than Hammersmith and Fulham's median of 77 for full applications. Approved, as 98% of full applications here are.

28%decided within 8 weeks
98%approved
759decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
13 Aug 2025
Comments by
7 Oct 2025
Site or press notice
20 Aug 2025
Statutory expiry
20 Oct 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.