90 Colwith Road, London, W6 9EZ Data via plota.co.uk

P/2026/02320/HH - Householder Application REGISTERED: Under Consultation

Proposal

Installation of an air conditioning unit above the main flat roof at roof level; installation of a rooflight above the roof of rear back addition; installation of decking on the flat roof and erection of wooden balustrades around the perimeter of the rear back addition at second floor level in connection with its use as a terrace; Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Sept 2026
✓
Validated
17 Nov 2026
Decision
Expected by 12 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 24 Jan 2027 and 9 Feb 2027, from Hammersmith and Fulham's recent extensions.

Comments are open until 23 Dec 2026

Comment on this application ↗

Documents 27

Plans & drawings 19

PDF 90 Colwith Proposed Revised Drawing · 16 Nov 2026 View ↗ PDF 90 Colwith Proposed Revised Main Drawing · 16 Nov 2026 View ↗ PDF LocationPlan.pdf Drawing · 7 Sept 2026 View ↗ PDF 90 colwith site plan.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Block plan of the site_included_in_SiteBlock Plan - Existing.pdf Drawing · 7 Sept 2026 View ↗ PDF 90 colwith existing.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Elevation (Front) - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Elevation (Rear) - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Elevation (Side) - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Floor Plan - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Roof Plan - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Section - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 7 Sept 2026 View ↗ PDF Elevation (Front) - Proposed_included_in_Layout Plan - Proposed.pdf Proposed Drawings · 7 Sept 2026 View ↗ PDF Elevation (Rear) - Proposed_included_in_Layout Plan - Proposed.pdf Proposed Drawings · 7 Sept 2026 View ↗ PDF Elevation (Side) - Proposed_included_in_Layout Plan - Proposed.pdf Proposed Drawings · 7 Sept 2026 View ↗ PDF Floor plan_included_in_Layout Plan - Proposed.pdf Drawing · 7 Sept 2026 View ↗ PDF Roof Plan - Proposed_included_in_Layout Plan - Proposed.pdf Proposed Drawings · 7 Sept 2026 View ↗ PDF Section - Proposed_included_in_Layout Plan - Proposed.pdf Proposed Drawings · 7 Sept 2026 View ↗ PDF MixedCombined Plans_included_in_Layout Plan - Proposed.pdf Drawing · 7 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Crabtree conservation area
Also 49. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £950,000 in October 2024. Flat or maisonette, leasehold.

11 October 2024£950,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area113 m² (1,216 sq ft)
Energy ratingC (73 out of 100)
PropertyEnd-terrace maisonette, 5 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in July 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder Application
Postcode
W6 9EZ
Received
7 Sept 2026
Validated
17 Nov 2026
Ward
Fulham Reach
Case officer
Show
Applicant
Show

Decision outlook

Day 6 of the 56-day target. Hammersmith and Fulham usually decides extensions by day 76.

Day 670 days to the predicted decision (day 76)
24%decided within 8 weeks
98%approved
509decided in the last year

Plota live figures for extensions decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
19 Nov 2026
Comments by
23 Dec 2026
Site or press notice
2 Dec 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.