28 Brownsea View Avenue Poole BH14 8LQ Data via plota.co.uk

P/26/04467/TTPO - Tree work to tree/s subject to a TPO Application Under Consideration

Proposal

T1 - English oak- Undertake a full crown reduction of no more than 1.25m from the tips inwards. Ensuring that all cuts are brought back to viable growth points and that no pruning wounds exceed 65mm in diameter. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Nov 2026 and 16 Nov 2026, from BCP's recent tree and landscaping works.

Site constraints 5

Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Ramsar wetland about 384 m away: Poole Harbour; SSSI about 384 m away: Poole Harbour SSSI; Inside the Poole built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £1,525,000 in September 2022. Detached house, freehold.

27 September 2022£1,525,000
3 January 2007£1,200,000
15 December 2004£410,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area231 m² (2,486 sq ft)
Energy ratingC (76 out of 100), could reach B
PropertyDetached house, 6 habitable rooms
Built2003 to 2006
HeatingBoiler and underfloor heating, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in January 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Tree work to tree/s subject to a TPO
Postcode
BH14 8LQ
Received
15 Sept 2026
Validated
15 Sept 2026
Ward
Penn Hill
Parish
Poole Town Council
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Primary Tree Care Ltd

Decision outlook

Day 24 of the 56-day target. BCP usually decides tree and landscaping works by day 58.

Day 2434 days to the predicted decision (day 58)
45%decided within 8 weeks
96%approved
1,638decided in the last year

Plota live figures for tree and landscaping works decided by BCP in the last twelve months, from validation. BCP decision record →

BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.