4 Mill Street, Warwick, CV34 4HB Data via plota.co.uk
Proposal
T1 - Acer - Prune back selected branches by up to 2m from branch tips T2, T3, T4 - Yew - Prune back lower branches by up to 2m T5 - Sycamore - Perform an overall crown reduction and shaping by up to 2.5m from branch tips T6 & T7 - Yew - Perform an overall crown reduction and shaping by up to 2.5m from branch tips Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 17 Dec 2026, from Warwick's recent tree and landscaping works.
Site constraints 7
Show all 24 with distances
- 2 m14, Mill StreetGrade II
- 9 m12, Mill StreetGrade II
- 18 m18, Mill StreetGrade II
- 20 m6, 8 and 10 Mill StreetGrade II
- 20 m15, Mill StreetGrade II
- 21 m17 and 19, Mill StreetGrade II
- 26 m25, Mill StreetGrade II
- 27 mThe Malt HouseGrade II
- 33 m20-26, Mill StreetGrade II
- 33 mCobb CottageGrade II
- 40 m13 Mill StreetGrade II
- 46 mAllens HouseGrade II*
- 49 m11 Mill StreetGrade II
- 56 mThe Mill HouseGrade II
- 59 m5, 7 and 9 Mill StreetGrade II
- 63 mThe GablesGrade II*
- 68 m2 Mill StreetGrade II
- 68 m1 and 3, Mill StreetGrade II
- 77 m43, Mill StreetGrade II*
- 82 mGuys CourtGrade II
- 87 mWarwick Castle LodgeGrade II
- 95 mMill Cottage and 55, Mill StreetGrade II
- 97 mPortion of Boundary Wall to Warwick Castle Abutting Mill StreetGrade II*
- 119 mStocksGrade II
Checked on 10 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Warwick - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
4 The Mellows, Chapel Street, Warwick, CV34 4HL
Retrospective installation of gate to front boundary railing.
20 Smith Street, Warwick, CV34 4HS
Erection of a single storey rear extension.
33 Bridge End, Warwick, CV34 6PB
T1 - Silver Birch - Reduce by up to 30% inline with BS3998, tree is approx. 20m ...
81 Coten End, Warwick, CV34 4NU
Proposed reinstatement of brick wall to match existing
37 Cherry Street, Coten End, Warwick, CV34 4LR
Erection of two storey rear & side extension to existing two storey rear extensi...
1 The Templars, Bridge End, Warwick, CV34 6PF
Erection of single storey rear extension.
Important details
Decision outlook
Day 14 of the 56-day target. Warwick usually decides tree and landscaping works by day 38.
Plota live figures for tree and landscaping works decided by Warwick in the last twelve months, from validation. Warwick decision record →
Public comments
No public comments yet.
Last counted 17 Nov 2026
Consultation & key dates
- Alt. reference
- PP-15355952
- Planning Portal ref
- PP-15355952
- Consultation
- 10 Nov 2026
- Comments by
- 1 Dec 2026
- Statutory expiry
- 21 Dec 2026
- Env. assessment
- No
Historical activity at this location
33 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Warwick is slower than most councils at deciding householder applications: #249 of 296 on speed. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
Track this application
4 Mill Street, Warwick, CV34 4HB
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

Comments are open until 1 Dec 2026