Northfields Prospect Business Centre 16 Northfields SW18 1PE Data via plota.co.uk

2026/2972 - Application for Full Permission Pending Consideration

Proposal

Installation of 3 x wall mounted Air Source Heat Pumps on rear elevation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Aug 2026
Decision
Expected by 13 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Wandsworth's recent commercial premises.

Site constraints 12

Wandsworth Thames Policy Area (Core Strategy & DMPD)Heliport CAA Height RestrictionsFocal Points of Activity (Core Strategy & DMPD)
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Wandsworth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Registered park or garden 48 m away: Wandsworth Park
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Conservation area 10 m away: Wandsworth Town
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Wandsworth Thames Policy Area (Core Strategy & DMPD)Council record
Recorded by the council for this site.
Council site ↗
Heliport CAA Height RestrictionsCouncil record
Recorded by the council for this site.
Council site ↗
Focal Points of Activity (Core Strategy & DMPD)Council record
Recorded by the council for this site.
Council site ↗
Also on the record
1 listed building within 150 m; Inside the Wandsworth built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Metropolitan Open Land 45 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area120 m² (1,292 sq ft)
Energy ratingC (asset rating 70)
UseOffices and Workshop Businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in June 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Wandsworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wandsworth
Application type
Application for Full Permission
Postcode
SW18 1PE
Received
18 Aug 2026
Validated
18 Aug 2026
Ward
Thamesfield
Case officer
Show
Target decision
13 Oct 2026
Applicant
Show
Agent
Chestnut Planning

Decision outlook

Day 52, past Wandsworth's usual 48 days for commercial premises. 85% are decided within thirteen weeks, so most likely by 17 Nov 2026.

Day 524 days to the 56-day target
65%decided within 8 weeks
90%approved
228decided in the last year

Plota live figures for commercial premises decided by Wandsworth in the last twelve months, from validation. Wandsworth decision record →

Consultation & key dates

Alt. reference
15131340
Statutory expiry
10 Sept 2026
Wandsworth
Planning Authority Score
4.8/10
Below average
#164 of 296 councils
Relevant to this application:
Householder decisions

Wandsworth ranks #172 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Wandsworth decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #120 of 296
92%
Householder approved
Above avg (90%) #168 of 296
62%
Decided in 8 weeks
Below avg (63%) #172 of 296
37%
Extended time limit
Below avg (41%) #124 of 296
89%
Minor dwellings approved
680 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
72%
Change of use approved
36 decided
2,062
Total decisions
206 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.