Uned 8 Llys Onnen, Bangor, LL57 4DF Data via plota.co.uk

C26/0546/25/LL - Full Planning In Progress

Proposal

Cais ôl-weithredol ar gyfer un uned aerdymheru a lleoli tair uned aerdymheru arfaethedig ychwanegol wedi'u osod ar y wal gefn. Retrospective application for one air conditioning unit and proposed sitting of three additional air conditioning units mounted on the rear wall. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Sept 2026
✓
Validated
24 Sept 2026
Decision
Expected by 19 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 20 Jan 2027 and 4 Mar 2027, from Gwynedd's recent utility and infrastructure works.

The consultation period closed on 19 Oct 2026.

Site constraints 2

Ancient woodland 6 m away: Restored Ancient Woodland Site
Inside the 15 m buffer standing advice asks for from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Full Planning
Postcode
LL57 4DF
Received
10 Sept 2026
Validated
24 Sept 2026
Ward
Y Faenol
Parish
Pentir
Case officer
Show
Target decision
19 Nov 2026
Decision level
Dirprwyedig / Delegated
Applicant
Show

Decision outlook

Day 55 of the 56-day target. Gwynedd usually decides utility and infrastructure works by day 133.

Day 5578 days to the predicted decision (day 133)
10%decided within 8 weeks
84%approved
19%go to committee

Plota live figures for utility and infrastructure works decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
19 Oct 2026
Statutory expiry
19 Nov 2026