King George V Playing Field Bar End Road Winchester Hampshire Data via plota.co.uk

26/01764/FUL - Full Application Current

Proposal

Change of use of the existing club room to an office space. No external, extensions or other physical works. This would be occupied by approximately 4-8 staff members on a typical working day with occasional monthly team meeting attended by approx. 10 people. The office would operate during normal business hours, between 09:00 - 17:00, Monday to Friday (excluding bank holidays) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Aug 2026
✓
Validated
17 Sept 2026
Decision
Expected by 12 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 23 Nov 2026 and 7 Dec 2026, from Winchester's recent changes of use.

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National park 288 m away: South Downs.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 25 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Winchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Winchester
Application type
Full Application
Received
24 Aug 2026
Validated
17 Sept 2026
Ward
ST MICHAEL WARD
Parish
Winchester Town
Case officer
Show
Applicant
Show

Decision outlook

Day 17 of the 56-day target. Winchester usually decides changes of use by day 78.

Day 1761 days to the predicted decision (day 78)
28%decided within 8 weeks
86%approved
41decided in the last year

Plota live figures for changes of use decided by Winchester in the last twelve months, from validation. Winchester decision record →

Consultation & key dates

Alt. reference
PP-15167503
Env. assessment
No
Winchester
Planning Authority Score
4.5/10
Below average
#177 of 296 councils
Relevant to this application:
Change of use

Winchester is slower than most councils at deciding householder applications, ranking #213 out of 296. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Winchester decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #72 of 296
97%
Householder approved
Above avg (90%) #47 of 296
55%
Decided in 8 weeks
Below avg (63%) #213 of 296
50%
Extended time limit
Above avg (41%) #230 of 296
70%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
88%
Change of use approved
32 decided
918
Total decisions
60 refused in the year to March 2026