The Royal British Legion Cartergate Grimsby North East Lincolnshire DN31 1QZ Data via plota.co.uk

DM/0716/26/TPO - Works to a tree with a TPO Approved

Proposal

T1 (Holly) Lift crown to 5m above car park level then hedge trim the sides to give it a better form. T2 (Lime) Lift crown to 5m above car park level, reduce the radial spread to 5m from the main stem, reduce lower limb on the Southern side to a suitable growth point to limit encroachment over the adjacent parking bays, reshaping to secondary shoots. Clean out crossing branches and dead wood. T3 (Lime) Lift crown to 5m above car park level, reduce the radial spread to 5m from the main stem to clear Funeral Directors parking area and service road, reshaping to secondary shoots. Clean out basal suckers, epicormic shoots, crossing branches and dead wood. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Sept 2026
✓
Approved
5 Nov 2026

Approved on 5 Nov 2026 · Delegated Decision · Last checked 6 Nov 2026

Site constraints 4

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
Conservation area 35 m away: Wellow; Heritage at risk 35 m away: Wellow, Grimsby; Inside the Grimsby built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to a tree with a TPO
Postcode
DN31 1QZ
Received
10 Sept 2026
Validated
10 Sept 2026
Ward
West Marsh
Case officer
Show
Target decision
5 Nov 2026
Decision
Approved with Conditions
Decision date
5 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Ross Davy Associates

How this decision compares

Decided in 56 days from validation, 14 days slower than North East Lincs's median of 42 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

87%decided within 8 weeks
99%approved
142decided in the last year

Plota live figures for tree and landscaping works decided by North East Lincs in the last twelve months, from validation. North East Lincs decision record →

Public comments

No public comments yet.

Last counted 6 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15216546
Planning Portal ref
PP-15216546
Statutory expiry
5 Nov 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 overall
Relevant to this application:
Householder decisions

North East Lincs is #151 of 296 councils on householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026