100 Pall Mall London SW1Y 5NQ Data via plota.co.uk
Description
DOFF clean of external elevations; Localised roof slate replacements; Localised leadwork repair/replacement to areas that have been damaged at 6th floor terrace; Gutter repairs; Lightwell elevational tile replacements; Mansafe system replacement; Lightwell bird netting replacement; Fenestration repairs and decorations; and Metalwork decorations and localised repairs. Data via plota.co.uk
Nearby new applications
68 - 69 Burlington Arcade London W1J 0QU
Installation of signage and internal refurbishment works within Burlington Arcad...
Heddon Street London
Use of the public highway for the placing of tables and chairs outside 11 premis...
Unit 4, Downing Street, City
Use of Warehouse Unit for Light Industrial purposes with ancillary storage and o...
Venture House 27 - 29 Glasshouse Street London W1B 5DF
Samples (photographs and specification)of the facing materials you will use, inc...
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Details of changes to the approved works to the existing building fabric and rep...
63 - 65 Piccadilly London W1J 0DY
Details of new windows, dormer windows, and external doors pursuant to condition...
Historical activity at this location
39 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Westminster is slower than most councils at deciding householder applications, ranking #227 out of 292. Only 27% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.
