9 - 11 Chapel Lane Kingston Upon Hull Data via plota.co.uk

25/00880/CONDET - Discharge of condtions Approved

Proposal

Discharge of condition 14 of approval ref. 25/00510/S19 - Variation of condition 1 (approved plans) of approval (Listed Building Consent for:- Internal and external alterations in connection with proposed conversion of the buildings from commercial and unused warehouses to 36 residential dwellings) Involving: - On-site variations to layout to deal with existing internal features and the requirements for thermal and sound upgrade to comply with Building Control as well as other variations to deal with minor alterations to the internal arrangement Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Sept 2025
✓
Validated
24 Sept 2025
✓
Approved
24 Oct 2025

Approved on 24 Oct 2025 · Delegated Decision · Last checked 12 Oct 2026

Associated applications 8

Site constraints 7

Grade II listed: Statue of William de-la-Pole
List entry 1442748 · The pin is inside its outline · 64 more listed buildings within 150 m (2 Grade I, 5 Grade II*, 57 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 64 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Old Town conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project 186 m away: A63 Castle Street Improvement-Hull
The site is 186 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Special area of conservation 422 m away: Humber Estuary; SSSI 422 m away: Humber Estuary - 2000480 SSSI; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Discharge of condtions
Received
23 Sept 2025
Validated
24 Sept 2025
Ward
St Andrews And Dockland
Case officer
Show
Decision
Conditions Discharged
Decision date
24 Oct 2025
Decision level
Delegated Decision
Agent
ADP

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14353888
Planning Portal ref
PP-14353888
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026