Land adjacent to Elsham Wolds Industrial Estate, North Lincolnshire Data via plota.co.uk

PA/2025/643 - Outline planning permission Approved at committee

Approved at planning committee on 11 March 2026. The council has not issued its decision notice yet.

Proposal

Outline planning permission for the construction of a data centre park, including ancillary offices, internal plant and cooling equipment, emergency backup generators with associated fuel storage, district heating centre, flexible commercial/amenity building(s) (Use Classes E, F1 and F2) and construction of buildings for agricultural purposes; other works include means of access, internal roads and footpaths, cycle and car parking, hard and soft landscaping, security gatehouses and perimeter fencing, lighting, drainage, pumping station, electricity substation(s), energy generation/storage, undergrounding of overhead power lines and other associated works, infrastructure and ground remodelling including creation of landscaped bunds, with all matters reserved for subsequent consideration - each phase of the development to be a severable component ADDITIONAL INFORMATION RECEIVED 08.09.2026 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 22 May 2025
✓
Committee
11 Mar 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 6 Oct 2026; it is now day 545.

The consultation period closed on 6 Oct 2026.

Planning committee

Decided by North Lincs Planning Committee on 11 Mar 2026. The council has not yet issued its decision notice.

Approved

As officers recommended.

  • Officers advised granting permission because the economic and other benefits outweighed the identified landscape and heritage harm, subject to controls.
  • Objectors raised concerns about consultation, quality of life, construction impacts, climate change, emissions and the need for an environmental assessment.
  • The committee voted to grant permission in line with the officer recommendation.
Read how the committee decided The proposal, site, consultation responses, speakers, committee debate, vote and decision.

Source: Plota analysis of North Lincs's committee minutes of 11 Mar 2026.

Site constraints 2

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project 275 m away: H2East Pipeline: Humber to Nottinghamshire, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a data centre?

Plota Sites searches every land parcel in England and Wales: 3,798 sites fit this search. On and off the market, free to search.

Land for data centres
Work with planning data?

Every application in North Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline planning permission
Received
around 22 May 2025
Validated
22 May 2025
Ward
Brigg and Wolds
Parish
Elsham
Case officer
Show

Decision outlook

Day 545, past the statutory target. 59% of outline applications in North Lincs are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 545489 days past the 56-day target
38%decided within 8 weeks
61%approved
13%go to committee

Plota live figures for outline applications decided across the UK in the last twelve months, from validation; too few recent outline applications in North Lincs to go on. North Lincs decision record →

Consultation & key dates

Comments by
6 Oct 2026
North Lincs
Planning Authority Score
4.6/10
Below average
#169 of 296 councils
Relevant to this application:
Major dwellings

North Lincs ranks #123 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Lincs decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #195 of 296
91%
Householder approved
Above avg (90%) #177 of 296
70%
Decided in 8 weeks
Above avg (63%) #123 of 296
44%
Extended time limit
Above avg (41%) #182 of 296
70%
Minor dwellings approved
114 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
78%
Change of use approved
37 decided
705
Total decisions
96 refused in the year to March 2026