Waterside Place 7 Town Quay Southampton SO14 2ET Data via plota.co.uk

25/01241/FUL - Full Application Approved

Proposal

Replacement of walkway and balustrade. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 30 Sept 2025
✓
Consultation
7 Oct 2025
✓
Approved
20 Nov 2025

Approved on 20 Nov 2025 · Delegated Decision · Last checked 6 Nov 2026

Site constraints 11

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Calshot to Gosport across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 13 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Scheduled monument 83 m away: Town wall: Gods House Gate and Tower
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
15 listed buildings within 150 m
Nearest: Harbour Board Offices, Grade II, 28 m away · 5 Grade I, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 15 with distances
Historic England ↗
Also on the record
Conservation area 53 m away: Old Town South; National infrastructure project 685 m away: Solent Gateway 2, at pre-application; Inside the Southampton built-up area; Air quality management area 39 m away: AQMA No.4 (Town Quay).
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,147 m² (12,346 sq ft)
Energy ratingC (asset rating 64)
UseOffices and Workshop Businesses
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in December 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO14 2ET
Received
around 30 Sept 2025
Validated
30 Sept 2025
Ward
Bargate
Case officer
Show
Target decision
25 Nov 2025
Decision
Approve with Conditions
Decision date
20 Nov 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Walsh and Associates Limited
Leaseholder
Show

How this decision compares

Decided in 51 days from validation, 4 days faster than Southampton's median of 55 for full applications. Approved, as 91% of full applications here are.

66%decided within 8 weeks
91%approved
6%go to committee

Plota live figures for full applications decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

9 neighbours consulted · Last counted 6 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
20892
Neighbours
7 Oct 2025
Consultation
7 Oct 2025
Comments by
28 Oct 2025
Statutory expiry
25 Nov 2025
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 overall
Relevant to this application:
Householder decisions

Southampton is #158 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.