Land At 19 21 And 23 Harper Road 325 Borough High Street And 1-5 And 7-11 Newington Causeway London SE1 6AW Data via plota.co.uk

25/AP/1854 - Variation of a legal agreement Approved

Proposal

Deed of Variation to the Section 106 (ref. LEG/ ) relating to planning permission dated 06/02/2024. The proposed amendments alter the definition of "Substantial Implementation Target Date" from the date 24 months from but excluding the date of the grant of Planning Permission to 36 months from but excluding the date of the grant of Planning Permission (with any further delay to be agreed by formal submission of evidence). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Jun 2025
✓
Validated
30 Jun 2025
✓
Approved
2 Oct 2025

Approved on 2 Oct 2025 · Source Team · Last checked 17 Nov 2026

Associated applications 5

Site constraints 13

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
3 Article 4 directions
Site allocation NSP12: 19, 21 and 23 Harper Road, 325 Borough High Street, 1-5 and 7-11 Newington Causeway · Site allocation NSP12: 19, 21 and 23 Harper Road, 325 Borough High Street, 1-5 and 7-11 Newington Ca · Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
9 listed buildings within 150 m
Nearest: Inner London Sessions Court, Grade II, 36 m away · 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
National infrastructure project 832 m away: Thames Tideway Tunnel
The site is 832 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 33 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area 78 m away: Trinity Church Square; Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 23 m away: Elephant and Castle/ Walworth Road; Designated open space 42 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Variation of a legal agreement
Postcode
SE1 6AW
Received
27 Jun 2025
Validated
30 Jun 2025
Ward
Chaucer
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
24 Aug 2025
Decision
Agreed - for App Types VLA and VNMC
Decision date
2 Oct 2025
Decision level
Source Team
Agent
Turley, on behalf of LDC (Portfolio) Ltd

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
24 Aug 2025
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026