The Spinney Pound Street Lyme Regis DT7 3JA Data via plota.co.uk

P/TRT/2025/07116 - Tree Works- TPO Approved

Proposal

T1 Yew - Reduce height from 12m to 10m to previous cuts no reduction in width average cut less than 3m, T2 Lime - Remove the 5 largest diameter stems leaving 5 smaller stems, T3 Oak - 18m tall re pollard back to original pollard reducing overall height by 6m and width by 3m from 10m average cut less than 100mm Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Nov 2025
✓
Approved
21 Jan 2026

Approved on 21 Jan 2026 · Delegated · Last checked 16 Oct 2026

Site constraints 8

Dorset National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
43 listed buildings within 150 m
Nearest: Shamien Hotel, Grade II, 32 m away · 1 Grade II*, 42 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 43 with distances
Historic England ↗
Special area of conservation 259 m away: Lyme Bay and Torbay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Conservation area 11 m away: Lyme Regis Conservation Area 1
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
Radon affected area, class 4; SSSI 426 m away: Chesil & The Fleet SSSI; Inside the Lyme Regis built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Tree Works- TPO
Postcode
DT7 3JA
Received
28 Nov 2025
Validated
28 Nov 2025
Ward
Lyme and Charmouth Ward
Parish
Lyme Regis
Case officer
Show
Decision
Tree Works - TPO - Consent
Decision date
21 Jan 2026
Decision level
Delegated

How this decision compares

Decided in 54 days from validation, 28 days slower than Dorset's median of 26 for tree and landscaping works. Approved, as 95% of tree and landscaping works here are.

99%decided within 8 weeks
95%approved
2,324decided in the last year

Plota live figures for tree and landscaping works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
19 Dec 2025
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026