PA/25/02040/NC - Full Planning Permission Approved

Proposal

Installation of air source heat pump units at roof level on the Assam Street building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Dec 2025
✓
Consultation
8 Jan 2026
✓
Approved
11 Mar 2026

Approved on 11 Mar 2026 · Delegated · Last checked 8 Oct 2026

Documents 22

All documents on the council site ↗

Site constraints 11

Archaeological priority area: Tower Hamlets APA 2.9
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
10 listed buildings within 150 m
Nearest: John Walker and Sons Ltd Warehouse, Grade II, 6 m away · 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
National infrastructure project 634 m away: Thames Tideway Tunnel
The site is 634 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 815 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area 54 m away: Whitechapel High Street; Heritage at risk 61 m away: Whitechapel High Street, Aldgate; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 98 m away: Whitechapel.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E1 1DF
Received
around 16 Dec 2025
Validated
16 Dec 2025
Ward
Whitechapel
Case officer
Show
Target decision
11 Mar 2026
Decision
Permit
Decision date
11 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
Iceni Projects

How this decision compares

Decided in 85 days from validation, 29 days slower than Tower Hamlets's median of 56 for full applications. Approved, as 86% of full applications here are.

60%decided within 8 weeks
86%approved
658decided in the last year

Plota live figures for full applications decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
29 Jan 2026
Site or press notice
8 Jan 2026
Statutory expiry
10 Feb 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026