31 Station Road Plympton Plymouth Data via plota.co.uk

Pending 26/01385/TPO
Council
Date received
5 Oct 2026
Date validated
5 Oct 2026

Description

T2 - fell T5261 - fell T5262 -fell T5263 - fell T5256 - Re-pollard Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 15 Nov 2026, from Plymouth's recent tree and landscaping works.

Day 4 of the 56-day target. Plymouth usually decides tree and landscaping works by day 41.

Day 452 days to the 56-day target
91%decided within 8 weeks
95%approved
187decided in the last year

Plota live figures for tree and landscaping works decided by Plymouth in the last twelve months, from validation. Plymouth decision record →

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Plymouth built-up area; Flood defence about 46 m from the postcode pin (engineered high ground, designed for a 1 in 50 year flood).
Not affected
Not green belt · No scheduled monument at the site

Checked on 8 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Plymouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Plymouth
Planning Authority Score
7/10
Good
#63 of 296 councils
Relevant to this application:
Householder decisions

Plymouth is faster than most councils at deciding householder applications, ranking #86 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Plymouth decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #64 of 296
94%
Householder approved
Above avg (90%) #114 of 296
74%
Decided in 8 weeks
Above avg (63%) #86 of 296
32%
Extended time limit
Below avg (41%) #67 of 296
88%
Minor dwellings approved
48 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
87%
Change of use approved
46 decided
680
Total decisions
50 refused in the year to March 2026