TP/2026/0502 - TPO Pending Consideration

Proposal

T1 - Deodar Cedar - Reduce by 3m height and width. T2 - Deodar Cedar - Remove broken limbs. Remove deadwood greater than 50mm in diameter. Reduce N and E limbs to clear buildings by 2.5m. T6 - Yew - Reduce east stem by 1m. T11 - Beech - Prune to clear building by 2m. T13 - Silver Birch - Reduce to clear building by 2m. T14 - Fuji Cherry - Cut back to kerb line. T15 - Goat Willow - Reduce back to near previous points - not re-pollard. T22 - Large-leaved Lime - Cut back to clear building by 2m. T23 - Beech - Lift over footpath to 2.4m. Remove dead limb. T27 - Red Oak - Cut back to clear the building by 2m. Remove deadwood greater than 40mm. T28 - Large-leaved Lime - Remove epicormic growth and report findings. T31 - Holly - Remove to ground level. T32 - Common Lime - Remove to ground level. T41 - Sycamore - Reduce to clear building by 2m. T42 - Sycamore - Prune to clear building by 2m. T45 - Leyland Cypress - Cut back to clear building by 2m. T49 - Large-leaved Lime - Re-pollard back to historic pruning points. T50 - Large-leaved Lime - Re-pollard back to historic pruning points. T51 - Large-leaved Lime - Re-pollard back to historic pruning points. T52 - Large-leaved Lime - Re-pollard back to historic pruning points. T53 - Beech - Reduce to clear building by 3m. T55 - London Plane - Lift to 2.4m over path. T56 - London Plane - Lift over path to 2.4m. T60 - Large-leaved Lime - Re-pollard back to historic pruning points. T63 - Austrian Pine - Reduce NE limb by 3m. T65 - Sycamore - Reduce canopy to clear dieback, remove deadwood and lift over path to 2.4m. T66 - Red Oak - Remove to ground level. T67 - Lawsons Cypress - Prune to clear building by 1m where possible. Remove ivy. T69 - London Plane - Prune to clear building by 3m. Remove low dead branch over path. T71 - Silver Birch - Reduce branches to clear building by 2m. G1 - Mixed trees - Lift all trees to 2.4m above ground level over footpath and 5.5m over roadway. Remove Lime tree directly next to large crack in the w Data via plota.co.uk

View original council record ↗Last checked

St Albans City and District Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
30 Sept 2026
✓
Validated
1 Oct 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 53.

The consultation period closed on 22 Oct 2026.

Site constraints 4

St Albans - St Peters Park and the Marlborough House Estate conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
1 listed building within 150 m of the postcode pin
Nearest: Blocks A B C D E F & L Oaklands College City Campus Hatfield Road St Albans, about 36 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Also on the record
Radon affected area, class 2; Inside the St Albans built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in St Albans - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
St Albans
Application type
TPO
Postcode
AL1 3FT
Received
30 Sept 2026
Validated
1 Oct 2026
Ward
Bernards Heath
Case officer
Show
Target decision
25 Nov 2026
Applicant
Show
Agent
Evoke Tree Services Ltd

Decision outlook

Day 53, past St Albans's usual 43 days for tree and landscaping works. 99% are decided within thirteen weeks, so most likely by 31 Dec 2026.

Day 533 days to the 56-day target
93%decided within 8 weeks
99%approved
573decided in the last year

Plota live figures for tree and landscaping works decided by St Albans in the last twelve months, from validation. St Albans decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
324187PLN
Planning Portal ref
15263098
Comments by
22 Oct 2026
Statutory expiry
25 Nov 2026
Env. assessment
No
St Albans
Planning Authority Score
1.1/10
Poor
#290 of 296 overall
Relevant to this application:
Householder decisions

St Albans is one of the slowest councils in England for householder decisions: #285 of 296 on speed. The council extends the time limit on 64% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
St Albans decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #180 of 296
88%
Householder approved
Below avg (90%) #226 of 296
29%
Decided in 8 weeks
Below avg (63%) #285 of 296
64%
Extended time limit
Above avg (41%) #278 of 296
74%
Minor dwellings approved
130 decided (1-9 homes)
61%
Major dwellings approved
18 decided (10+ homes)
77%
Change of use approved
26 decided
1,411
Total decisions
184 refused in the year to March 2026