Tulk House Ottershaw Park Ottershaw Surrey KT16 0QG Data via plota.co.uk

RU.25/1256 - TPO Tree Works Decided

Proposal

T12 - Mixed group - including large Oak - cut back overhanging branches to clear parking area to avoid damage to cars G63 - W6 Ash within woodland group - Fell to leave 4m standing pole - dying from Ash die-back G63 - W10, W11 and W12 Ash within woodland group - Fell to ground level - dead and dying from Ash die-back T64 - Oak - Raise canopy up to 5m over road and garage to allow clearance for vehicles T65 - Oak - Raise canopy up to 5m over road and garage to allow clearance for vehicles Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 23 Sept 2025
✓
Decided
22 Oct 2025

Decided on 22 Oct 2025 · Last checked 13 Oct 2026

Site constraints 5

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1.1 km away: Southampton to London Pipeline Project; Priority habitat about 22 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Runnymede - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Runnymede
Application type
TPO Tree Works
Postcode
KT16 0QG
Received
around 23 Sept 2025
Validated
23 Sept 2025
Ward
Ottershaw
Case officer
Show
Decision date
22 Oct 2025
Runnymede
Planning Authority Score
5.2/10
Average
#140 of 296 overall
Relevant to this application:
Householder decisions

Runnymede is #108 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Runnymede decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #242 of 296
89%
Householder approved
Below avg (90%) #208 of 296
72%
Decided in 8 weeks
Above avg (63%) #108 of 296
36%
Extended time limit
Below avg (41%) #113 of 296
66%
Minor dwellings approved
74 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
55%
Change of use approved
11 decided
661
Total decisions
110 refused in the year to March 2026