Gag Aye Farm,Carr Lane,Longnor, Data via plota.co.uk

NP/SM/0226/0200 - Full Planning Permission Approved

Proposal

Replacement of existing stables/storage building and construction of a new outbuilding to form domestic annexe. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Feb 2026
✓
Validated
17 Feb 2026
✓
Approved
29 Jun 2026

Approved on 29 Jun 2026 · Last checked 9 Sept 2026

Site constraints 6

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Priority habitat: Lowland dry acid grassland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Lowland dry acid grassland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI about 215 m away: Moss Carr SSSI; Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £725,000 in March 2021. Other property, freehold.

26 March 2021£725,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area78 m² (840 sq ft)
Energy ratingE (49 out of 100), could reach B
PropertySemi-detached house, 4 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
SK17 0RJ
Received
16 Feb 2026
Validated
17 Feb 2026
Parish
Longnor
Case officer
Show
Decision
Granted Conditionally
Decision date
29 Jun 2026
Applicant
Show

How this decision compares

Decided in 132 days from validation, 79 days slower than Peak District's median of 53 for demolitions. Approved, as 86% of demolitions here are.

56%decided within 8 weeks
86%approved
38decided in the last year

Plota live figures for demolitions decided by Peak District in the last twelve months, from validation. Peak District decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
18 Feb 2026
Comments by
23 Mar 2026
Statutory expiry
14 Apr 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.