391 - 395 City Road, London, EC1V 1NG Data via plota.co.uk

P2026/1535/FUL - Full Planning Application VALIDATED

Proposal

External alterations to the existing building, including the removal and installation of plant, introduction of new and amended windows and doors, removal of existing roof overrun, installation of roof-level ventilation features, provision of a ramp at the front entrance, removal of existing canopy and stairs at front entrance, alterations to lightwell and alterations to access stair, together with associated works (Development may affect the setting of Grade II listed buildings). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jul 2026
✓
Validated
13 Jul 2026
✓
Consultation
20 Aug 2026
Decision
Expected by 31 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 12 Sept 2026; it is now day 88.

The consultation period closed on 12 Sept 2026.

Site constraints 26

Article 4 directionCAZCentral Activities ZoneIslington LU Zones of InterestLocal Plan Strategic and Development Management Policies - Policy B1 DeliveringLocal Plan Strategic and Development Management Policies - Policy R10 Culture anAlexandra Palace viewing terrace to St Paul's CathedralCrossrail 2Site within 100m of a TLRN RoadAngel Town CentreSite within 100m of a SRN RoadWithin 50m of New RiverDuncan Terrace/Colebrooke RowII
Grade II listed: Numbers 2-10 (Consecutive) and Attached Railings
List entry 1292974 · 22 m away · 14 more listed buildings within 150 m (14 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 14 with distances
Historic England ↗
Duncan Terrace/Colebrooke Row conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Protected view corridor: 1A.2 Alexandra Palace viewing terrace to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Angel
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
CAZCouncil record
Recorded by the council for this site.
Council site ↗
Central Activities ZoneCouncil record
Recorded by the council for this site.
Council site ↗
Islington LU Zones of InterestCouncil record
Recorded by the council for this site.
Council site ↗
Local Plan Strategic and Development Management Policies - Policy B1 DeliveringCouncil record
Recorded by the council for this site.
Council site ↗
Local Plan Strategic and Development Management Policies - Policy R10 Culture anCouncil record
Recorded by the council for this site.
Council site ↗
Alexandra Palace viewing terrace to St Paul's CathedralCouncil record
Recorded by the council for this site.
Council site ↗
Crossrail 2Council record
Recorded by the council for this site.
Council site ↗
Site within 100m of a TLRN RoadCouncil record
Recorded by the council for this site.
Council site ↗
Angel Town CentreCouncil record
Recorded by the council for this site.
Council site ↗
Site within 100m of a SRN RoadCouncil record
Recorded by the council for this site.
Council site ↗
Within 50m of New RiverCouncil record
Recorded by the council for this site.
Council site ↗
Duncan Terrace/Colebrooke RowCouncil record
Recorded by the council for this site.
Council site ↗
IICouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
National infrastructure project 1961 m away: Thames Tideway Tunnel; Inside the Islington built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Heritage at risk 87 m away: Angel; Priority habitat 36 m away: Deciduous woodland; Designated open space 36 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,165 m² (12,540 sq ft)
Energy ratingD (asset rating 78)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in May 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Full Planning Application
Postcode
EC1V 1NG
Received
7 Jul 2026
Validated
13 Jul 2026
Ward
St Peter's & Canalside
Case officer
Show
Target decision
31 Aug 2026
Applicant
Show
Agent
Craig Stewart

Decision outlook

Day 88, past the statutory target. 84% of extensions in Islington are decided within thirteen weeks, which runs to 12 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 8832 days past the 56-day target
60%decided within 8 weeks
94%approved
663decided in the last year

Plota live figures for extensions decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-14983685
Comments by
12 Sept 2026
Site or press notice
20 Aug 2026
Statutory expiry
9 Sept 2026
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 councils
Relevant to this application:
Householder decisions

Islington is slower than most councils at deciding householder applications, ranking #260 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.